© Copyright 2024 - DCHC MPO
4307 Emperor Blvd., Suite 110
Durham, NC 27703
919.560.4366
Site Map
CTP Projects Start new search
Project List
CTP ID | Project | Improvement Type | Mode | Status | Section | Description |
ORAN0181-M | Homestead Rd | Non Highway Grade Separation | Multi-Use | Recommended | Chapel Hill H.S. multiuse path | Chapel HIll High School multiuse path tunnel under Homestead Rd Carr |
ORAN0182-M | I-40 | Non Highway Grade Separation | Multi-Use | Recommended | Dry Creek Trail | Dry Cr Tr pass under I-40 using culvert near Eastown and New Hope Commons DurCity CH, OR |
ORAN0183-M | I-40 | Non Highway Grade Separation | Multi-Use | Recommended | New Hillborough collector road | Bicycle/pedestrian bridge over I-85 OR, Hboro |
ORAN0184-M | I-40 | Non Highway Grade Separation | Multi-Use | Recommended | Orange Grove Rd | Grade separate bike/ped path from I-40 OR |
ORAN0185-M | I-85 | Non Highway Grade Separation | Multi-Use | Recommended | Cates Creek Greenway | Bridge to separate I-85 and Cates Creek Greenway. From H'boro Planning Hboro |
ORAN0186-M | MLK Boulevard | Non Highway Grade Separation | Multi-Use | Recommended | Umstead Dr/Bolin Creek Trail | Below grade crossing of Bolin Creek Trail at MLK Blvd., from CH Planning CH |
ORAN0187-M | NC 54 | Non Highway Grade Separation | Multi-Use | Recommended | Duke Easement Trail | Grade separate NC 54 (Chapel Hill bypass) and Duke Easement Trail 3 CH |
ORAN9987-M | NC 54 | Non Highway Grade Separation | Multi-Use | Existing | Meadowmont | Bike-Ped tunnel under NC 54 at Meadowmont CH |
ORAN9986-M | Riverwalk | Non Highway Grade Separation | Multi-Use | Existing | Mainline railroad | Riverwalk passes under railroad bridge Hboro |
ORAN9985-M | S Churton St | Non Highway Grade Separation | Multi-Use | Existing | Riverwalk | S. Churton St bridge passes over Riverwalk Hboro |
ORAN0188-M | Smith Level Rd | Non Highway Grade Separation | Multi-Use | Recommended | Morgan Creek Greenway | Morgan Creek Greenway under existing Smith Level Rd bridge Carr |
ORAN9984-M | US 15-501 | Non Highway Grade Separation | Multi-Use | Existing | Morgan Creek to Merritt Pasture Trail | Bike-Ped tunnel under US 15-501 CH |
ORAN0189-M | US 15-501 | Non Highway Grade Separation | Multi-Use | Recommended | Obey Creek development | Bike-Ped bridge crossing US 15-501 at Obey Cr. dev't., from CH Planning CH |
DURH0252-B | N Miami Blvd | Multiuse Path | Bicycle | Needs Improvement | Geer St to US 70 | US 70 to be frwy; Sep. multiuse adjacent to frwy |
DURH0277-B | Pickett Rd | Multiuse Path | Bicycle | Needs Improvement | Chapel Hill Rd to Erwin Rd | Bicycle Lane. Multiuse if unpaved section closed. |
Page 25 of 148