Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
666 S Briggs Av/E Peetigrew/NCRR New Grade Separation 0 0 NCRR (railroad tracks) S Briggs Av/E Peetigrew $0.00 Traffic Sep St. Two bridges. Draft CTP
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
664 S Briggs Av Extension/CSX rail New Grade Separation 0 0 CSX rail S Briggs Av Extension $0.00 Draft CTP
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
610 East End Connector/E Pettigrew St Ext New Grade Separation 0 0 E Pettigrew St East End Connector $0.00 Part of EEC project?
694 US 70/Pleasant Dr New Grade Separation 0 0 Pleasant Dr US 70 $2,325,000.00 Part of US 70 project. Cost based on Fartn/NC 54
628 Glover Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Glover Rd $4,515,000.00 Traffic Sep St. Cost based on Ellis Rd
696 Wrenn Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Wrenn Rd $4,515,000.00 Cost based on Ellis Rd. TSS only has access road
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
692 US 70/Page Rd Ext/Leesville Rd Ext New Grade Separation 0 0 Page Rd Ext/Leesville Rd Ext US 70 $0.00 Draft CTP. US 70 Study pending.
652 MLK Pkwy Extension/CSX rail New Grade Separation 0 0 CSX rail MLK Pkwy Extension $0.00 Draft CTP
654 MLK Pkwy Extension/S Alston Av New Grade Separation 0 0 S Alston Av MLK Pkwy Extension $0.00 Draft CTP
606 E Cornwallis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) E Cornwallis Rd $12,000,000.00 Traffic Sep St. Draft CTP
674 US 15-501/Mt Moriah Rd New Grade Separation 0 0 Mt Moriah Rd US 15-501 $0.00 Draft CTP. Not part of Us 15-501 Plan.
Page 10 of 16