Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
61 Old Oxford Connector New Location 0 2 Thompson Rd Dearborn Dr $4,092,000.00 one-fifth is already built
610 East End Connector/E Pettigrew St Ext New Grade Separation 0 0 E Pettigrew St East End Connector $0.00 Part of EEC project?
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
620 Fayetteville/Riddle/Buxton Intersection Upgrade 0 0 Riddle Rd Fayetteville Rd $5,000,000.00 Align Ridlle/Buxton.Durham CIP
622 Fordham Blvd/Ephesus Ch Rd Intersection Upgrade 0 0 Ephesus Ch Rd US 15-501 $2,170,000.00 U-5550. Costs not in hwy project.
624 Fordham Blvd/Manning Dr Intersection Upgrade 0 0 Manning Dr US 15-501/NC 54 $15,700,000.00 U-5304E
626 Fordham Blvd/S Columbia St Interchange Upgrade 0 0 S Columbia St US 15-501/NC 54 $35,000,000.00 U-5304E. Cost not in hwy project
628 Glover Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Glover Rd $4,515,000.00 Traffic Sep St. Cost based on Ellis Rd
63 MLK Pkwy/NC 55 Extension New Location 0 4 Cornwallis Rd NC 55 $2,606,000.00 Use old feasibility study
630 I-40/Danzier Dr New Grade Separation 0 0 Danzier Dr I-40 $0.00 See 15-501 Plan & SW Dur Collector Street Plan
632 I-40/Fayetteville Rd Interchange Upgrade 0 0 Fayetteville Rd I-40 $0.00 Draft CTP. I-40 feas study
634 I-40/NC 147 Interchange Upgrade 0 0 NC 147 I-40 $0.00 Draft CTP. I-40 feas study
Page 10 of 16