Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
367 Erwin Rd Modernization 4 4 W Main St Cameron Blvd $12,025,000.00 Private $ (LRT). Used 100% ROW
476 University Dr Modernization 5 4 Shannon Rd MLK Parkway $768,000.00 Private $ (LRT). 158,000 tip
694 US 70/Pleasant Dr New Grade Separation 0 0 Pleasant Dr US 70 $2,325,000.00 Part of US 70 project. Cost based on Fartn/NC 54
464 Smallwood Dr Extension New Location 0 2 Page Rd Crown Pkwy/Roche Dr $3,022,000.00 Part of this road already built? If so, adjust!
610 East End Connector/E Pettigrew St Ext New Grade Separation 0 0 E Pettigrew St East End Connector $0.00 Part of EEC project?
688 US 70/NC 98 Interchange Upgrade 0 0 NC 98 US 70 $0.00 Part of EEC project. Draft CTP
682 US 70/East End Connector/Carr Rd New Interchange 0 0 Carr Rd US 70/East End Connector $0.00 Part of EEC project
656 NC 147/East End Connector New Interchange 0 0 East End Connector NC 147 $0.00 Part of EEC project
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
77.2 NC 751 Widening 2 4 Renaissance Pkwy NC 54 $5,290,000.00 Part built. SPOT is correct cost basis.
51 Lake Hogan Farms Rd New Location 0 2 Legends Way Eubanks Rd $4,407,000.00 Part built already. Used 0.7 mile in cost calc
49 I-85 Widening 4 6 Red Mill Rd US 70 $215,940,000.00 Part already built
200 Eubanks Rd Widening 2 4 Millhouse Rd MLK Blvd (NC 86) $7,487,000.00 Orig terminated at Rogers, so reduced cost
Page 5 of 16