© Copyright 2024 - DCHC MPO
4307 Emperor Blvd., Suite 110
Durham, NC 27703
919.560.4366
Site Map
MTP Projects Start new search
Project List
MTP ID | Project | Improvement Type | Existing Number of Lanes | Proposed Number of Lanes | Extent To | Extent From | Estimated Cost | Staff Comments |
640 | I-40/New Hope Common Dr Ext | New Grade Separation | 0 | 0 | New Hope Common Dr Ext | I-40 | $0.00 | See 15-501 Study & SW Dur Collector Street Plan |
64.13 | NC 147 (possible Managed Lanes) | Widening | 4 | 8 | I-40 | East End Conn | $179,248,000.00 | U-5934 |
64.12 | NC 147 (Operational Improvements) | Modernization | 4 | 4 | Swift Av | East End Connector | $58,400,000.00 | U-5937 |
638 | I-40/NC 86 | Interchange Upgrade | 0 | 0 | NC 86 | I-40 | $16,500,000.00 | |
636 | I-40/NC 54 | Interchange Upgrade | 6 | 7 | NC 54 | I-40 | $94,100,000.00 | U-5774F. Cost not in hwy project. No $ in STIP |
634 | I-40/NC 147 | Interchange Upgrade | 0 | 0 | NC 147 | I-40 | $0.00 | Draft CTP. I-40 feas study |
632 | I-40/Fayetteville Rd | Interchange Upgrade | 0 | 0 | Fayetteville Rd | I-40 | $0.00 | Draft CTP. I-40 feas study |
630 | I-40/Danzier Dr | New Grade Separation | 0 | 0 | Danzier Dr | I-40 | $0.00 | See 15-501 Plan & SW Dur Collector Street Plan |
63 | MLK Pkwy/NC 55 Extension | New Location | 0 | 4 | Cornwallis Rd | NC 55 | $2,606,000.00 | Use old feasibility study |
628 | Glover Rd/NCRR | New Grade Separation | 0 | 0 | NCRR (railroad tracks) | Glover Rd | $4,515,000.00 | Traffic Sep St. Cost based on Ellis Rd |
626 | Fordham Blvd/S Columbia St | Interchange Upgrade | 0 | 0 | S Columbia St | US 15-501/NC 54 | $35,000,000.00 | U-5304E. Cost not in hwy project |
624 | Fordham Blvd/Manning Dr | Intersection Upgrade | 0 | 0 | Manning Dr | US 15-501/NC 54 | $15,700,000.00 | U-5304E |
622 | Fordham Blvd/Ephesus Ch Rd | Intersection Upgrade | 0 | 0 | Ephesus Ch Rd | US 15-501 | $2,170,000.00 | U-5550. Costs not in hwy project. |
620 | Fayetteville/Riddle/Buxton | Intersection Upgrade | 0 | 0 | Riddle Rd | Fayetteville Rd | $5,000,000.00 | Align Ridlle/Buxton.Durham CIP |
618 | Ellis Rd/NCRR | New Grade Separation | 0 | 0 | NCRR (railroad tracks) | Ellis Rd | $4,515,000.00 | Traffic Sep St. Draft CTP. Cost based on Ellis Rd |
Page 6 of 16