© Copyright 2024 - DCHC MPO
4307 Emperor Blvd., Suite 110
Durham, NC 27703
919.560.4366
Site Map
MTP Projects Start new search
Project List
MTP ID | Project | Improvement Type | Existing Number of Lanes | Proposed Number of Lanes | Extent To | Extent From | Estimated Cost | Staff Comments |
656 | NC 147/East End Connector | New Interchange | 0 | 0 | East End Connector | NC 147 | $0.00 | Part of EEC project |
614 | East End Connector/US 70 | New Interchange | 0 | 0 | US 70 | East End Connector | $0.00 | Part of EEC project |
686 | US 70/Lynn Rd Extension | New Interchange | 0 | 0 | Lynn Rd Extension | US 70 | $0.00 | Draft CTP. US 70 Study pending (gr sep or intchg?) |
680 | US 70/Angier Av | New Interchange | 0 | 0 | Angier Av | US 70 | $0.00 | Draft CTP. US 70 Study pending. |
690 | US 70/Northern Durham Parkway | New Interchange | 0 | 0 | US 70 | Northern Durham Parkway | $0.00 | Draft CTP. US 70 Study pending. |
658 | NC 55/MLK Pkwy | New Interchange | 0 | 0 | MLK Pkwy | NC 55 | $0.00 | Draft CTP |
676 | US 15-501/Southwest Durham Dr | New Interchange | 0 | 0 | Southwest Durham Dr | US 15-501 | $0.00 | Draft CTP. US 15-501 Plan. |
70.2 | NC 54/Farrington Rd | New Grade Separation | 0 | 6 | NC 54 | Farrington Rd | $2,325,000.00 | U-5774E. Costs in U-5774F. No $ in STIP |
640 | I-40/New Hope Common Dr Ext | New Grade Separation | 0 | 0 | New Hope Common Dr Ext | I-40 | $0.00 | See 15-501 Study & SW Dur Collector Street Plan |
630 | I-40/Danzier Dr | New Grade Separation | 0 | 0 | Danzier Dr | I-40 | $0.00 | See 15-501 Plan & SW Dur Collector Street Plan |
662 | Orange Grove Connector/NCRR | New Grade Separation | 0 | 0 | NC Rail Road | Orange Grove Connector | $0.00 | Draft CTP |
648 | I-85/New Collector (Hillsborough) | New Grade Separation | 0 | 0 | New Collector Road | I-85 | $0.00 | Hboro will finance |
604 | Dimmocks Mill Rd/NCRR | New Grade Separation | 0 | 0 | NCRR (railroad tracks) | Dimmocks Mill Rd | $11,600,000.00 | High Hboro priority; upgraded to 2045 |
660 | Neal Rd/NCRR | New Grade Separation | 0 | 0 | NCRR (railroad tracks) | Neal Rd | $5,300,000.00 | Draft CTP |
644 | I-85/Alston Av Extension | New Grade Separation | 0 | 0 | Alston Av Extension | I-85 | $0.00 | Draft CTP |
Page 9 of 16