Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
491 I-40 Managed Lanes Widening 6 8 I-85 NC 86 $238,906,000.00 148,978,000 in TIP
5 Alston Ave Ext New Location 0 2 Old Oxford/Roxboro Holloway St $26,050,000.00
5.3 Barbee Chapel Rd Widening 2 4 Farrington Mill Rd NC 54 $12,417,000.00
50.11 Jack Bennet Rd/Lystra Rd Modernization 2 2 Farrington Mill/Point Rd US 15-501 South $20,567,000.00
501 Yates Store Rd Extension New Location 0 2 Wake Rd Yates Store Rd $11,519,000.00 In CTP
502 Patriot Dr Extension New Location 0 2 Page Rd S Miami Blvd $13,086,000.00 In CTP
503 NC 147 (Durham Freeway) Modernization 4 4 I-85 Swift Av $0.00 In CTP
51 Lake Hogan Farms Rd New Location 0 2 Legends Way Eubanks Rd $4,407,000.00 Part built already. Used 0.7 mile in cost calc
52 Latta Rd Modernization 2 3 Roxboro Rd Guess Rd $6,477,000.00
53 Leesville Rd Ext New Location 0 2 Leesville Rd US 70/Page Rd Ext $2,644,000.00 CTP has northern section still
57 Lynn Rd Extension New Location 0 2 Existing Lynn Rd US 70 $6,862,000.00 Added to accommodate US 70
60 Midland Terrace New Location 0 2 Geer St NC 98 $13,631,000.00 one-fifth is already built
604 Dimmocks Mill Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Dimmocks Mill Rd $11,600,000.00 High Hboro priority; upgraded to 2045
606 E Cornwallis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) E Cornwallis Rd $12,000,000.00 Traffic Sep St. Draft CTP
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
Page 9 of 16