Overview

The Projects page provides a listing of all projects in the DCHC MPO area. The list can be re-sorted by clicking on the column name at the top of each column. The entire listing of projects can be exported to a Microsoft Excel-compatible .CSV file by clicking the “Export” button that is located above the index, on the right side of the page.

Project List

TIP # Project Name Description Project Expected Start Date Total Cost
U-5823 Woodcroft Parkway Extension SR 1116 (Garrett Rd) to NC 751 (Hope Valley Rd) in Durham. Construct roadway on new alignment. Planning, design, right of way, and construction by the City of Durham. Non-state system facility, local match by City of Durham. Prior Year $2,814,000
U-6245 West Ten Road Improvements Construct overlay, paved shoulders, and turn lanes from Buckhorn Road to west of Bushy Cook Road. 2020 $938,000
C-5572 West Ellerbe Creek Greenway Trail West Ellerbe Creek Greenway Phase II: Westover Park to Stadium Drive in Durham. Construct multi-use path. Planning, design, right of way, and construction are in progress by the City of Durham. 2016 $2,279,888
ER-5600 Vegetation Management Clear zone improvement and management statewide. Prior Year $39,264,000
U-5543 Variable Message Signs in Chapel Hill Variable message signs for traffic management on major corridors in Chapel Hill. Construction is in progress by the Town of Chapel Hill. 2016 $1,626,250
U-5518 US 70 Upgrade Upgrade US 70 from west of TW Alexander Drive (SR 3067) to I-540 in Raleigh to improve capacity, safety, and traffic operations including interchanges at various locations. 2025 $392,603,000
U-5720B US 70 (Miami Boulevard) Upgrades - Miami Boulevard Intersection Improvements Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. 2027 $94,800,000
U-5720C US 70 (Miami Boulevard) Upgrades Future Unfunded $68,100,000
U-5720A US 70 (Miami Boulevard) - Lynn Road to Miami Boulevard Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. 2027 $62,700,000
EB-5715 US 501 Bypass (North Duke Street) Sidewalks Construct sidewalk on east side of North Duke Street from Murray Avenue to US 501 Business (North Roxboro Road) to fill in existing gaps. Planning, design, right of way, and construction by the City of Durham. Prior Year $4,774,254
U-5516 US 501 (Roxboro Rd) SR 1448 Latta Road / SR 1639 Infinity Road intersection in Durham. Intersection Improvements. 2025 $18,741,000
U-6192 US 15-501 Synchronized Street Conversion US 15-501 from Smith Level Road to US 64 Bypass in Chatham County. Convert remaining non-synchronized sections to synchronized street. Programmed for planning and environmental study only to expedite delivery of new STI project. 2026 $117,700,000
U-5304B US 15-501 (Fordham Boulevard) Upgrades - NC 86 to NC 54 Full U-5304 project is NC 86 (S Columbia St) to I-40 in Chapel Hill. Upgrade corridor. Total project length is 6.0 miles. Total project cost for the entire project is $131,266,000. Break B for the project is from th NC 86 interchange to the NC 54 interchange in Chapel Hill. Provide capacity improvements with sidewalks, wide outside lanes, and transit accommodations. Project costs for only Break B are shown in the table below. 2029 $28,285,000
U-5304D US 15-501 (Fordham Boulevard) Upgrades - NC 54 to Ephesus Church Road Full U-5304 project is NC 86 (S Columbia St) to I-40 in Chapel Hill. Upgrade corridor. 2029 $35,344,000
U-5304E US 15-501 (Fordham Boulevard) Upgrades - Manning Drive Intersection Full U-5304 project is NC 86 (S Columbia St) to I-40 in Chapel Hill. 2029 $37,446,000
Page 1 of 30