© Copyright 2024 - DCHC MPO
4307 Emperor Blvd., Suite 110
Durham, NC 27703
919.560.4366
Site Map
TIP Projects Start new search
Project List
TIP # | Project Name | Description | Project Expected Start Date | Total Cost |
BL-0070 | Chatham County Pedestrian Safety Improvements | Chatham County is requesting to utilize its STBGDA funds to give to NCDOT for three pedestrian safety projects. We have received HILC funds from Division 8 for $17,500 to partially cover the local match, and the county will providing the rest. Compiled into one total project, we will be giving $139,866 to NCDOT to help carry out 3 bike/ped safety projects around the county. The non-federal match required is $34,966.50. These projects will require no ROW acquisition. | 2023 | $180,133 |
BL-0101 | Cameron Avenue Protected Bike Lanes/Cycle Track | Add bike infrastructure on Cameron Ave from Merritt Mill Road to Pittsboro Street. Project will further consider project areas such as Pittsboro Street to Columbia Street and improvements to the Merritt Mill/Cameron intersection to ultimately connect Libba Cotten bikeway to the UNC Campus, which is one of the highest volume bike corridors in the region. | 2023 | $900,000 |
BO-2415 | Morgan Creek Greenway (Chapel Hill) | Bike-Ped project in Chapel Hill. This segment of the Morgan Creek Greenway would connect the existing path at the trailhead to the soon-to-be-constructed Carrboro portion at Smith Level Road. The existing greenway is highly used and extending it to the west to Carrboro and beyond has long been a priority for both Towns. | 2023 | $2,370,000 |
BP-5500DIV | Bridge Preservation, Division | Bridge preservation issues at selected division project sites. | Prior Year | $9,794,000 |
BP-5500REG | Bridge Preservation, Regional | Bridge preservation issues at selection regional project sites. | Prior Year | $9,794,000 |
BP-5500SW | Bridge Preservation, Statewide | Bridge preservation issues at selected statewide project sites. | Prior Year | $13,059,000 |
C-3600 | CMAQ: DMV | Department of Motor Vehicles (DMV) vehicle emission compliance system. Upgrade North Carolina's motor vehicle emissions inspection and maintenance (I/M) program. This project is in progress by the Department of Motor Vehicles. | Prior Year | $6,702,000 |
C-4902 | Solar Center Clean Transportation Program | North Carolina State University Solar Center Clean Transportation Program. Develop and administer a seven year clean fuel-advanced technology rebate program in all CMAQ eligible counties to reduce emissions. | Prior Year | $4,694,000 |
C-4903 | CMAQ: Air Awareness | North Carolina Department of Environment and Natural Resources. North Carolina Air Awareness Outreach Program to provide education and produce daily air quality forecast. This project is in progress by the NCDENR division of air quality. | Prior Year | $1,500,000 |
C-4928 | SR 1317 (Morreene Road) | Construct bike lanes and sidewalks along Morreene Road in Durham, from Neal Road to SR 1320 (Erwin Road). Planning, design, right of way, and construction by the City of Durham. This project is in progress. | 2022 | $10,637,308 |
C-5179 | SR 1750 (North Estes Drive) | Construct five foot sidewalks and five foot bike lanes on North Estes Drive from NC 86 (Martin Luther King, Jr. Boulevard) to Caswell Drive in Chapel Hill. Construct a ten-foot multi-use path along North Estes Drive from NC 86 (Martin Luther King, Jr. Boulevard) to Elliott Road in Chapel Hill. Planning, design, right of way, and construction are in progress by the Town of Chapel Hill. | Prior Year | $9,159,133 |
C-5181 | Jones Creek Greenway | Construct a 100 foot bridge and 650 foot paved trail in Carrboro to fill gap between the Upper Bolin Trail and Twin Creeks Greenway and implement program to support non-vehicle trips to Morris Grove Elementary School. Planning, design, right of way, and construction by the Town of Carrboro. | 2022 | $922,000 |
C-5183 | Durham Sidewalks | $0 | ||
C-5183B | Sidewalks in Durham (Alston Avenue) | Sidewalks along Alston Avenue from Capp Street to Riddle Road. | 2023 | $1,795,526 |
C-5184 | Riverwalk Trail | Riverwalk Trail, Phase III in Hillsborough. Construct a paved off-road trail along Eno River connecting River Park, Gold Park, and the Occoneechee Mountain State Natural Area, and construct sidewalk to provide pedestrian and bicycle connections to the greenway. Planning, design, right of way, and construction are in progress by the Town of Hillsborough. | Prior Year | $1,258,563 |
Page 2 of 37