Overview

The MTP Projects page provides a listing of all MTP projects in the DCHC MPO area. The list can be re-sorted by clicking on the column name at the top of each column.

Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
331 Carr Rd Extension New Location 0 2 US 70/Carr Rd Angier Av $5,452,000.00
361 Ellis Rd Widening 2 3 Glover Rd Angier Av $6,784,000.00
9 Carver St Ext New Location 0 4 Old Oxford Rd Armfield St $0.00 $8,185,000 total cost
69.4 NC 54 Widening 2 4 NC 55 Barbee $46,400,000.00 U-5774J
20 Farrington Rd Modernization 2 2 Mt Carmel Church Rd Barbee Chapel Rd $18,381,000.00
23 Fayetteville Rd Widening 2 4 Cornwallis Rd Barbee Rd $3,374,000.00 Prorated from CIP
416 Mt Carmel Church Rd Widening 2 3 Old Farrington Rd Bennett Rd $18,033,000.00
367 Erwin Rd Modernization 4 4 W Main St Cameron Blvd $12,025,000.00 Private $ (LRT). Used 100% ROW
328 Carpenter Pond Rd Extension Modernization 2 2 Leesville Rd Carpenter Pond Rd $3,627,000.00
94 Roxboro St New Location 0 4 MLK Pkwy Cornwallis Rd $12,063,000.00
464 Smallwood Dr Extension New Location 0 2 Page Rd Crown Pkwy/Roche Dr $3,022,000.00 Part of this road already built? If so, adjust!
202 Hopson Rd Widening 2 4 S Miami Blvd (NC 54) Davis Dr $5,200,000.00
61 Old Oxford Connector New Location 0 2 Thompson Rd Dearborn Dr $4,092,000.00 one-fifth is already built
470 T.W. Alexander Dr New Location 0 4 Leesville Rd Del Webb Arbors $1,995,000.00
604 Dimmocks Mill Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Dimmocks Mill Rd $11,600,000.00 High Hboro priority; upgraded to 2045
Page 1 of 16