Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
419 Mt Willig Rd Modernization 2 2 US 70 I-40/I-85 $3,577,000.00 NCDOT have alts costed?
60 Midland Terrace New Location 0 2 Geer St NC 98 $13,631,000.00 one-fifth is already built
61 Old Oxford Connector New Location 0 2 Thompson Rd Dearborn Dr $4,092,000.00 one-fifth is already built
410 Marriott Way New Location 0 2 Barbree Chapel Rd Friday Center Dr $682,000.00 One-half built
413 Miami Blvd Extension New Location 0 3 Alston Av Extension E Geer St $508,000.00 one-half is built
200 Eubanks Rd Widening 2 4 Millhouse Rd MLK Blvd (NC 86) $7,487,000.00 Orig terminated at Rogers, so reduced cost
49 I-85 Widening 4 6 Red Mill Rd US 70 $215,940,000.00 Part already built
51 Lake Hogan Farms Rd New Location 0 2 Legends Way Eubanks Rd $4,407,000.00 Part built already. Used 0.7 mile in cost calc
77.2 NC 751 Widening 2 4 Renaissance Pkwy NC 54 $5,290,000.00 Part built. SPOT is correct cost basis.
682 US 70/East End Connector/Carr Rd New Interchange 0 0 Carr Rd US 70/East End Connector $0.00 Part of EEC project
656 NC 147/East End Connector New Interchange 0 0 East End Connector NC 147 $0.00 Part of EEC project
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
688 US 70/NC 98 Interchange Upgrade 0 0 NC 98 US 70 $0.00 Part of EEC project. Draft CTP
Page 11 of 16