Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
656 NC 147/East End Connector New Interchange 0 0 East End Connector NC 147 $0.00 Part of EEC project
664 S Briggs Av Extension/CSX rail New Grade Separation 0 0 CSX rail S Briggs Av Extension $0.00 Draft CTP
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
610 East End Connector/E Pettigrew St Ext New Grade Separation 0 0 E Pettigrew St East End Connector $0.00 Part of EEC project?
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
694 US 70/Pleasant Dr New Grade Separation 0 0 Pleasant Dr US 70 $2,325,000.00 Part of US 70 project. Cost based on Fartn/NC 54
686 US 70/Lynn Rd Extension New Interchange 0 0 Lynn Rd Extension US 70 $0.00 Draft CTP. US 70 Study pending (gr sep or intchg?)
628 Glover Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Glover Rd $4,515,000.00 Traffic Sep St. Cost based on Ellis Rd
696 Wrenn Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Wrenn Rd $4,515,000.00 Cost based on Ellis Rd. TSS only has access road
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
680 US 70/Angier Av New Interchange 0 0 Angier Av US 70 $0.00 Draft CTP. US 70 Study pending.
692 US 70/Page Rd Ext/Leesville Rd Ext New Grade Separation 0 0 Page Rd Ext/Leesville Rd Ext US 70 $0.00 Draft CTP. US 70 Study pending.
690 US 70/Northern Durham Parkway New Interchange 0 0 US 70 Northern Durham Parkway $0.00 Draft CTP. US 70 Study pending.
Page 6 of 16