Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
640 I-40/New Hope Common Dr Ext New Grade Separation 0 0 New Hope Common Dr Ext I-40 $0.00 See 15-501 Study & SW Dur Collector Street Plan
638 I-40/NC 86 Interchange Upgrade 0 0 NC 86 I-40 $16,500,000.00
636 I-40/NC 54 Interchange Upgrade 6 7 NC 54 I-40 $94,100,000.00 U-5774F. Cost not in hwy project. No $ in STIP
634 I-40/NC 147 Interchange Upgrade 0 0 NC 147 I-40 $0.00 Draft CTP. I-40 feas study
632 I-40/Fayetteville Rd Interchange Upgrade 0 0 Fayetteville Rd I-40 $0.00 Draft CTP. I-40 feas study
630 I-40/Danzier Dr New Grade Separation 0 0 Danzier Dr I-40 $0.00 See 15-501 Plan & SW Dur Collector Street Plan
70.4 I-40/ NC 54 ramp New Location 0 1 I-40 Farrington Rd. $1,600,000.00 Is this the NC 54 Study intch project?
397 I-40 Managed Lanes Widening 6 8 NC 86 US 15-501 $156,227,000.00 Mileage from SPOT 4.0
45 I-40 Managed Lanes Widening 8 10 NC 147 Wake County Line $446,464,000.00 FS = $64m/mi; SPOT=$100m/mi. Used FS
491 I-40 Managed Lanes Widening 6 8 I-85 NC 86 $238,906,000.00 148,978,000 in TIP
45.22 I-40 Managed Lanes Widening 6 10 NC 54 NC 147 $250,290,000.00
45.21 I-40 Managed Lane Widening 6 8 US 15-501 NC 54 $85,621,000.00 Reduce cost since only 8 lanes
45.3 I-40 (westbound auxiliary lane) Widening 6 7 NC 55 NC 147 $3,850,000.00
44 I-40 Widening 4 6 I-85 NC 86 $58,784,000.00 SPOT cost almost double?
43 I-40 Widening 4 6 NC 86 US 15-501 $29,316,000.00 SPOT cost almost double?
Page 10 of 16