Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
688 US 70/NC 98 Interchange Upgrade 0 0 NC 98 US 70 $0.00 Part of EEC project. Draft CTP
404 Lynn Rd Modernization 2 2 NC 98 (Holloway St) Gibson Rd $5,020,000.00
89 Olive Branch Rd Widening 2 4 NC 98 (Wake Forest Hwy) Leesville Rd $26,052,000.00
662 Orange Grove Connector/NCRR New Grade Separation 0 0 NC Rail Road Orange Grove Connector $0.00 Draft CTP
604 Dimmocks Mill Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Dimmocks Mill Rd $11,600,000.00 High Hboro priority; upgraded to 2045
660 Neal Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Neal Rd $5,300,000.00 Draft CTP
666 S Briggs Av/E Peetigrew/NCRR New Grade Separation 0 0 NCRR (railroad tracks) S Briggs Av/E Peetigrew $0.00 Traffic Sep St. Two bridges. Draft CTP
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
628 Glover Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Glover Rd $4,515,000.00 Traffic Sep St. Cost based on Ellis Rd
696 Wrenn Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Wrenn Rd $4,515,000.00 Cost based on Ellis Rd. TSS only has access road
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
606 E Cornwallis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) E Cornwallis Rd $12,000,000.00 Traffic Sep St. Draft CTP
379 Freeland Memorial Extension Add Access 0 2 New Collector Rd S Churton St $3,203,000.00 Private $ north of I-85
648 I-85/New Collector (Hillsborough) New Grade Separation 0 0 New Collector Road I-85 $0.00 Hboro will finance
Page 10 of 16