Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
69.3 NC 54 Widening 2 4 Barbee Fayetteville $46,800,000.00 U5774I. Incl I-40 bridge
69.4 NC 54 Widening 2 4 NC 55 Barbee $46,400,000.00 U-5774J
690 US 70/Northern Durham Parkway New Interchange 0 0 US 70 Northern Durham Parkway $0.00 Draft CTP. US 70 Study pending.
692 US 70/Page Rd Ext/Leesville Rd Ext New Grade Separation 0 0 Page Rd Ext/Leesville Rd Ext US 70 $0.00 Draft CTP. US 70 Study pending.
694 US 70/Pleasant Dr New Grade Separation 0 0 Pleasant Dr US 70 $2,325,000.00 Part of US 70 project. Cost based on Fartn/NC 54
696 Wrenn Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Wrenn Rd $4,515,000.00 Cost based on Ellis Rd. TSS only has access road
697 NC 751/O'Kelly Ch Rd Intersection Upgrade 0 0 O'Kelly Chapel Rd NC 751 $590,000.00 Upgrade and reallign intersection
698 NC 54/Old Fayetteville Rd Intersection Upgrade 0 0 Old Fayetteville Rd NC 54 $1,216,000.00
699 NC 751/University Dr roundabout Intersection Upgrade 0 0 University Dr NC 751 (Hope Valley Rd) $1,300,000.00
7 Briggs Av Extension New Location 0 2 S Guthrie Av S Briggs Av $3,954,000.00
70 NC 54 (widening; superstreet) Widening 4 6 Barbee Chapel Rd I-40 $9,100,000.00 U-5774C. No intchg costs incl.
70.2 NC 54/Farrington Rd New Grade Separation 0 6 NC 54 Farrington Rd $2,325,000.00 U-5774E. Costs in U-5774F. No $ in STIP
70.3 NC 54 Modernization 6 6 Barbee Chapel Rd Fordham Blvd (US 15-501) $32,106,000.00 U-5774B. CH no superstreets. Incl intchg
70.4 I-40/ NC 54 ramp New Location 0 1 I-40 Farrington Rd. $1,600,000.00 Is this the NC 54 Study intch project?
700 Mt Carmel Ch Rd/Bennett Rd roundabout Intersection Upgrade 0 0 Bennett Rd Mt Carmel Ch Rd $625,000.00 Roundabout and safety improvements
Page 13 of 16