Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
610 East End Connector/E Pettigrew St Ext New Grade Separation 0 0 E Pettigrew St East End Connector $0.00 Part of EEC project?
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
15 East End Connector (EEC) New Location 0 4 US 70 NC 147 $35,175,000.00 $140,700,000 total cost
15.1 East End Connector (EEC) Widening 4 6 US 70 NC 147 $24,581,000.00
606 E Cornwallis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) E Cornwallis Rd $12,000,000.00 Traffic Sep St. Draft CTP
355 E Cornwallis Rd Widening 2 4 S Miami Blvd T.W. Alexander Dr $15,567,000.00
352 E Carver St Widening 2 3 N Roxboro St (501 Bus) N Duke St (501 N) $1,997,000.00
349 Durham-Chapel Hill Blvd (US 15-501 Bus) Modernization 4 4 University Dr US 15-501 Bypass $12,847,000.00
604 Dimmocks Mill Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Dimmocks Mill Rd $11,600,000.00 High Hboro priority; upgraded to 2045
346 Danziger Dr Extension New Location 0 2 E Lakewood Dr Mt Moriah Rd $5,127,000.00
343 Crown Pkwy/Roche Dr New Location 0 2 T.W. Alexander Dr Page Rd $11,041,000.00 2/5 built already
12 Cornwallis Rd Widening 2 4 T. W. Alexander Dr MLK Pkwy Extension $6,131,000.00
337 Cole Mill Rd Widening 2 4 Rose of Sharon Rd Sparger Rd $10,011,000.00
Page 14 of 16