Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
91 Riddle Rd Ext New Location 0 2 NC 147 Ellis Rd $2,726,000.00
244 Angier/Glover Connector New Location 0 2 Glover Rd Ellis Rd $8,625,000.00
358 Ellis-Glover Connector New Location 0 2 Glover Rd Ellis Rd $8,058,000.00
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
8 Briggs Av Extension New Location 0 2 Riddle Rd Ed Cook Rd $7,021,000.00
440 New Hope Commons Dr Extension New Location 0 2 New Hope Commons Dr Eastowne Dr $4,588,000.00
64.12 NC 147 (Operational Improvements) Modernization 4 4 Swift Av East End Connector $58,400,000.00 U-5937
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
610 East End Connector/E Pettigrew St Ext New Grade Separation 0 0 E Pettigrew St East End Connector $0.00 Part of EEC project?
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
64.13 NC 147 (possible Managed Lanes) Widening 4 8 I-40 East End Conn $179,248,000.00 U-5934
461 S Greensboro St Modernization 2 2 NC 54 E Main St $3,401,000.00 Carrboro: no widening
307 Avondale Dr (NC 55) Widening 2 4 I-85 E Geer St $7,551,000.00 Used 100% for ROW
Page 14 of 16