Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
70 NC 54 (widening; superstreet) Widening 4 6 Barbee Chapel Rd I-40 $9,100,000.00 U-5774C. No intchg costs incl.
209 NC 54/Falconbridge New Interchange 0 4 Falconbridge Rd NC 54 $13,400,000.00 U-5774D. Costs in U-5774F. No $ in STIP
70.2 NC 54/Farrington Rd New Grade Separation 0 6 NC 54 Farrington Rd $2,325,000.00 U-5774E. Costs in U-5774F. No $ in STIP
636 I-40/NC 54 Interchange Upgrade 6 7 NC 54 I-40 $94,100,000.00 U-5774F. Cost not in hwy project. No $ in STIP
69.1 NC 54 Widening 2 4 NC 751 I-40 Interchange $32,000,000.00 U-5774G
69.2 NC 54 Widening 2 4 Highgate Dr NC 751 $21,600,000.00 U-5774H
69.21 NC 54 Modernization 4 4 Fayetteville Rd Highgate Dr $0.00 U-5774H
69.3 NC 54 Widening 2 4 Barbee Fayetteville $46,800,000.00 U5774I. Incl I-40 bridge
69.4 NC 54 Widening 2 4 NC 55 Barbee $46,400,000.00 U-5774J
87 S Churton St Widening 2 4 I-40 US 70 Business $31,825,000.00 U-5845
64.13 NC 147 (possible Managed Lanes) Widening 4 8 I-40 East End Conn $179,248,000.00 U-5934
64.12 NC 147 (Operational Improvements) Modernization 4 4 Swift Av East End Connector $58,400,000.00 U-5937
697 NC 751/O'Kelly Ch Rd Intersection Upgrade 0 0 O'Kelly Chapel Rd NC 751 $590,000.00 Upgrade and reallign intersection
63 MLK Pkwy/NC 55 Extension New Location 0 4 Cornwallis Rd NC 55 $2,606,000.00 Use old feasibility study
307 Avondale Dr (NC 55) Widening 2 4 I-85 E Geer St $7,551,000.00 Used 100% for ROW
Page 15 of 16