Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
644 I-85/Alston Av Extension New Grade Separation 0 0 Alston Av Extension I-85 $0.00 Draft CTP
688 US 70/NC 98 Interchange Upgrade 0 0 NC 98 US 70 $0.00 Part of EEC project. Draft CTP
682 US 70/East End Connector/Carr Rd New Interchange 0 0 Carr Rd US 70/East End Connector $0.00 Part of EEC project
666 S Briggs Av/E Peetigrew/NCRR New Grade Separation 0 0 NCRR (railroad tracks) S Briggs Av/E Peetigrew $0.00 Traffic Sep St. Two bridges. Draft CTP
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
656 NC 147/East End Connector New Interchange 0 0 East End Connector NC 147 $0.00 Part of EEC project
664 S Briggs Av Extension/CSX rail New Grade Separation 0 0 CSX rail S Briggs Av Extension $0.00 Draft CTP
608 East End Connector/Angier Av New Grade Separation 0 0 Angier Av East End Connector $0.00 Part of EEC project
612 East End Connector/NCRR New Grade Separation 0 0 NCRR (railroad tracks) East End Connector $0.00 Part of EEC project
610 East End Connector/E Pettigrew St Ext New Grade Separation 0 0 E Pettigrew St East End Connector $0.00 Part of EEC project?
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
694 US 70/Pleasant Dr New Grade Separation 0 0 Pleasant Dr US 70 $2,325,000.00 Part of US 70 project. Cost based on Fartn/NC 54
686 US 70/Lynn Rd Extension New Interchange 0 0 Lynn Rd Extension US 70 $0.00 Draft CTP. US 70 Study pending (gr sep or intchg?)
628 Glover Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Glover Rd $4,515,000.00 Traffic Sep St. Cost based on Ellis Rd
696 Wrenn Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Wrenn Rd $4,515,000.00 Cost based on Ellis Rd. TSS only has access road
Page 2 of 16