Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
624 Fordham Blvd/Manning Dr Intersection Upgrade 0 0 Manning Dr US 15-501/NC 54 $15,700,000.00 U-5304E
111 Fordham Blvd (US 15-501) Add Access 4 4 Franklin St I-40 $2,052,000.00 U-5304B; cap & op imp
240 Fordham Blvd (US 15-501) Modernization 4 4 Franklin Street NC 54 $45,498,000.00 U-5304A; cap & op imp
73 Fordham Blvd (US 15-501) Modernization 4 4 US 15-501 NC 54 $49,832,000.00 U-5304A; cap & op imp
75.1 NC 55 (Alston Ave) Widening 2 4 Main St NC 147 $0.00 U-3308
666 S Briggs Av/E Peetigrew/NCRR New Grade Separation 0 0 NCRR (railroad tracks) S Briggs Av/E Peetigrew $0.00 Traffic Sep St. Two bridges. Draft CTP
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
606 E Cornwallis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) E Cornwallis Rd $12,000,000.00 Traffic Sep St. Draft CTP
628 Glover Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Glover Rd $4,515,000.00 Traffic Sep St. Cost based on Ellis Rd
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
479 US 15-501 Modernization 4 4 MPO Boundary Smith Level Rd $25,673,000.00 Super St & intersections
44 I-40 Widening 4 6 I-85 NC 86 $58,784,000.00 SPOT cost almost double?
43 I-40 Widening 4 6 NC 86 US 15-501 $29,316,000.00 SPOT cost almost double?
201 Falconbridge Rd Extension New Location 0 4 NC 54 Farrington Rd $16,685,000.00 Some private $
401 I-540/NC 540 Widening 6 8 Wake County Line Durham County Line $35,965,000.00 See if feas st costs
Page 3 of 16