Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
91 Riddle Rd Ext New Location 0 2 NC 147 Ellis Rd $2,726,000.00
244 Angier/Glover Connector New Location 0 2 Glover Rd Ellis Rd $8,625,000.00
358 Ellis-Glover Connector New Location 0 2 Glover Rd Ellis Rd $8,058,000.00
616 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
431 NC 751 Widening 2 4 US 15-501 Bypass Erwin Rd $2,173,000.00
422 N Greensboro St Modernization 2 2 E Main St Estes Dr $3,131,000.00 Carrboro: no widening
701 Este Dr/N Greensboro St roundabout Intersection Upgrade 0 0 N Greensboro St Estes Dr $625,000.00
51 Lake Hogan Farms Rd New Location 0 2 Legends Way Eubanks Rd $4,407,000.00 Part built already. Used 0.7 mile in cost calc
373 Falconbridge Rd Connector New Location 0 2 Farrington Rd Falconbridge Rd $1,227,000.00
201 Falconbridge Rd Extension New Location 0 4 NC 54 Farrington Rd $16,685,000.00 Some private $
70.2 NC 54/Farrington Rd New Grade Separation 0 6 NC 54 Farrington Rd $2,325,000.00 U-5774E. Costs in U-5774F. No $ in STIP
70.4 I-40/ NC 54 ramp New Location 0 1 I-40 Farrington Rd. $1,600,000.00 Is this the NC 54 Study intch project?
69.3 NC 54 Widening 2 4 Barbee Fayetteville $46,800,000.00 U5774I. Incl I-40 bridge
452 Riddle Rd Widening 2 3 Ellis Rd Fayetteville Rd $10,040,000.00
Page 3 of 16