Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
15 East End Connector (EEC) New Location 0 4 US 70 NC 147 $35,175,000.00 $140,700,000 total cost
83.2 Northern Durham Pkwy New Location 0 4 I 85 N NC 98 $41,100,000.00
501 Yates Store Rd Extension New Location 0 2 Wake Rd Yates Store Rd $11,519,000.00 In CTP
502 Patriot Dr Extension New Location 0 2 Page Rd S Miami Blvd $13,086,000.00 In CTP
83.1 Northern Durham Pkwy New Location 0 4 NC 98 Sherron Rd $13,600,000.00
53 Leesville Rd Ext New Location 0 2 Leesville Rd US 70/Page Rd Ext $2,644,000.00 CTP has northern section still
304.1 Angier Av Ext New Location 0 2 Leesville Rd US 70 $4,784,000.00 Relocated based on EB and BJ
208 NC 54/Barbee Ch Rd Add Access 0 2 Barbee Chapel Rd NC 54 $0.00 U-5774B. Intchg cost in hwy. CH not support
209 NC 54/Falconbridge New Interchange 0 4 Falconbridge Rd NC 54 $13,400,000.00 U-5774D. Costs in U-5774F. No $ in STIP
70.2 NC 54/Farrington Rd New Grade Separation 0 6 NC 54 Farrington Rd $2,325,000.00 U-5774E. Costs in U-5774F. No $ in STIP
113.1 US 15-501/Garrett Rd Interchange New Interchange 0 6 Garrett Rd US 15-501 $71,200,000.00 U-5717. No intchg costs in hwy
624 Fordham Blvd/Manning Dr Intersection Upgrade 0 0 Manning Dr US 15-501/NC 54 $15,700,000.00 U-5304E
626 Fordham Blvd/S Columbia St Interchange Upgrade 0 0 S Columbia St US 15-501/NC 54 $35,000,000.00 U-5304E. Cost not in hwy project
642 I-40/US 15-501 Interchange Upgrade 0 0 US 15-501 I-40 $0.00 Costs included in U-6067?
640 I-40/New Hope Common Dr Ext New Grade Separation 0 0 New Hope Common Dr Ext I-40 $0.00 See 15-501 Study & SW Dur Collector Street Plan
Page 4 of 16