Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
640 I-40/New Hope Common Dr Ext New Grade Separation 0 0 New Hope Common Dr Ext I-40 $0.00 See 15-501 Study & SW Dur Collector Street Plan
64.13 NC 147 (possible Managed Lanes) Widening 4 8 I-40 East End Conn $179,248,000.00 U-5934
64.12 NC 147 (Operational Improvements) Modernization 4 4 Swift Av East End Connector $58,400,000.00 U-5937
638 I-40/NC 86 Interchange Upgrade 0 0 NC 86 I-40 $16,500,000.00
636 I-40/NC 54 Interchange Upgrade 6 7 NC 54 I-40 $94,100,000.00 U-5774F. Cost not in hwy project. No $ in STIP
634 I-40/NC 147 Interchange Upgrade 0 0 NC 147 I-40 $0.00 Draft CTP. I-40 feas study
632 I-40/Fayetteville Rd Interchange Upgrade 0 0 Fayetteville Rd I-40 $0.00 Draft CTP. I-40 feas study
630 I-40/Danzier Dr New Grade Separation 0 0 Danzier Dr I-40 $0.00 See 15-501 Plan & SW Dur Collector Street Plan
63 MLK Pkwy/NC 55 Extension New Location 0 4 Cornwallis Rd NC 55 $2,606,000.00 Use old feasibility study
628 Glover Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Glover Rd $4,515,000.00 Traffic Sep St. Cost based on Ellis Rd
626 Fordham Blvd/S Columbia St Interchange Upgrade 0 0 S Columbia St US 15-501/NC 54 $35,000,000.00 U-5304E. Cost not in hwy project
624 Fordham Blvd/Manning Dr Intersection Upgrade 0 0 Manning Dr US 15-501/NC 54 $15,700,000.00 U-5304E
622 Fordham Blvd/Ephesus Ch Rd Intersection Upgrade 0 0 Ephesus Ch Rd US 15-501 $2,170,000.00 U-5550. Costs not in hwy project.
620 Fayetteville/Riddle/Buxton Intersection Upgrade 0 0 Riddle Rd Fayetteville Rd $5,000,000.00 Align Ridlle/Buxton.Durham CIP
618 Ellis Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Ellis Rd $4,515,000.00 Traffic Sep St. Draft CTP. Cost based on Ellis Rd
Page 6 of 16