Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
77.11 Hope Valley Rd (NC 751) (Hope Valley Rd) Modernization 4 4 Woodcroft Pkwy NC 54 $0.00 Cost incl with S Roxboro to Woodcroft section
642 I-40/US 15-501 Interchange Upgrade 0 0 US 15-501 I-40 $0.00 Costs included in U-6067?
53 Leesville Rd Ext New Location 0 2 Leesville Rd US 70/Page Rd Ext $2,644,000.00 CTP has northern section still
223 Legion Rd Ext New Location 0 2 Fordham Blvd Legion Rd $1,500,000.00 Dev'r & private $; CH cost srce
662 Orange Grove Connector/NCRR New Grade Separation 0 0 NC Rail Road Orange Grove Connector $0.00 Draft CTP
660 Neal Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Neal Rd $5,300,000.00 Draft CTP
644 I-85/Alston Av Extension New Grade Separation 0 0 Alston Av Extension I-85 $0.00 Draft CTP
664 S Briggs Av Extension/CSX rail New Grade Separation 0 0 CSX rail S Briggs Av Extension $0.00 Draft CTP
658 NC 55/MLK Pkwy New Interchange 0 0 MLK Pkwy NC 55 $0.00 Draft CTP
652 MLK Pkwy Extension/CSX rail New Grade Separation 0 0 CSX rail MLK Pkwy Extension $0.00 Draft CTP
654 MLK Pkwy Extension/S Alston Av New Grade Separation 0 0 S Alston Av MLK Pkwy Extension $0.00 Draft CTP
680 US 70/Angier Av New Interchange 0 0 Angier Av US 70 $0.00 Draft CTP. US 70 Study pending.
668 US 15-501 Bypass/Hillsborough Rd Interchange Upgrade 0 0 Hillsborough Rd US 15-501 Bypass $0.00 Draft CTP. Coord w/roadway & intchg improvements
672 US 15-501 Bypass/NC 147 Interchange Upgrade 0 0 NC 147 US 15-501 Bypass $0.00 Draft CTP. Coord w/roadway & intchg improvements
670 US 15-501 Bypass/Morreene Rd Interchange Upgrade 0 0 Morreene Rd US 15-501 Bypass $0.00 Draft CTP. Coord w/roadway & intchg improvements
Page 8 of 16