Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
113.1 US 15-501/Garrett Rd Interchange New Interchange 0 6 Garrett Rd US 15-501 $71,200,000.00 U-5717. No intchg costs in hwy
682 US 70/East End Connector/Carr Rd New Interchange 0 0 Carr Rd US 70/East End Connector $0.00 Part of EEC project
656 NC 147/East End Connector New Interchange 0 0 East End Connector NC 147 $0.00 Part of EEC project
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
686 US 70/Lynn Rd Extension New Interchange 0 0 Lynn Rd Extension US 70 $0.00 Draft CTP. US 70 Study pending (gr sep or intchg?)
680 US 70/Angier Av New Interchange 0 0 Angier Av US 70 $0.00 Draft CTP. US 70 Study pending.
690 US 70/Northern Durham Parkway New Interchange 0 0 US 70 Northern Durham Parkway $0.00 Draft CTP. US 70 Study pending.
658 NC 55/MLK Pkwy New Interchange 0 0 MLK Pkwy NC 55 $0.00 Draft CTP
676 US 15-501/Southwest Durham Dr New Interchange 0 0 Southwest Durham Dr US 15-501 $0.00 Draft CTP. US 15-501 Plan.
123.11 Woodcroft Pkwy Ext New Location 0 2 Hope Valley Rd Garrett Rd $2,219,000.00 last const in 2021 but not committed
220 Purefoy Rd Ext New Location 0 2 Weaver Dairy Rd Sandberg Ln $3,777,000.00 local $ private $
221 S Elliot Rd Ext New Location 0 2 Ephesus Church Rd Fordham Blvd $4,230,000.00 CH cost srce, 0.32mile in spor; some local $
223 Legion Rd Ext New Location 0 2 Fordham Blvd Legion Rd $1,500,000.00 Dev'r & private $; CH cost srce
28.11 Glover Rd New Location 0 2 Angier US 70 $3,714,000.00 Added to accommodate US 70
5 Alston Ave Ext New Location 0 2 Old Oxford/Roxboro Holloway St $26,050,000.00
Page 8 of 16