Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
352 E Carver St Widening 2 3 N Roxboro St (501 Bus) N Duke St (501 N) $1,997,000.00
75.1 NC 55 (Alston Ave) Widening 2 4 Main St NC 147 $0.00 U-3308
15 East End Connector (EEC) New Location 0 4 US 70 NC 147 $35,175,000.00 $140,700,000 total cost
15.1 East End Connector (EEC) Widening 4 6 US 70 NC 147 $24,581,000.00
45.3 I-40 (westbound auxiliary lane) Widening 6 7 NC 55 NC 147 $3,850,000.00
45.22 I-40 Managed Lanes Widening 6 10 NC 54 NC 147 $250,290,000.00
656 NC 147/East End Connector New Interchange 0 0 East End Connector NC 147 $0.00 Part of EEC project
240 Fordham Blvd (US 15-501) Modernization 4 4 Franklin Street NC 54 $45,498,000.00 U-5304A; cap & op imp
4 T W Alexander Dr Widening 2 4 Cornwallis Rd NC 54 $13,842,000.00
5.3 Barbee Chapel Rd Widening 2 4 Farrington Mill Rd NC 54 $12,417,000.00
73 Fordham Blvd (US 15-501) Modernization 4 4 US 15-501 NC 54 $49,832,000.00 U-5304A; cap & op imp
77.2 NC 751 Widening 2 4 Renaissance Pkwy NC 54 $5,290,000.00 Part built. SPOT is correct cost basis.
230 Southwest Durham Dr New Location 0 2 I-40 NC 54 $12,402,000.00 10% built, but no 2-lane div cost avail
45.21 I-40 Managed Lane Widening 6 8 US 15-501 NC 54 $85,621,000.00 Reduce cost since only 8 lanes
77.11 Hope Valley Rd (NC 751) (Hope Valley Rd) Modernization 4 4 Woodcroft Pkwy NC 54 $0.00 Cost incl with S Roxboro to Woodcroft section
Page 8 of 16