Project List

MTP ID Project Improvement Type Existing Number of Lanes Proposed Number of Lanes Extent To Extent From Estimated Cost Staff Comments
656 NC 147/East End Connector New Interchange 0 0 East End Connector NC 147 $0.00 Part of EEC project
614 East End Connector/US 70 New Interchange 0 0 US 70 East End Connector $0.00 Part of EEC project
686 US 70/Lynn Rd Extension New Interchange 0 0 Lynn Rd Extension US 70 $0.00 Draft CTP. US 70 Study pending (gr sep or intchg?)
680 US 70/Angier Av New Interchange 0 0 Angier Av US 70 $0.00 Draft CTP. US 70 Study pending.
690 US 70/Northern Durham Parkway New Interchange 0 0 US 70 Northern Durham Parkway $0.00 Draft CTP. US 70 Study pending.
658 NC 55/MLK Pkwy New Interchange 0 0 MLK Pkwy NC 55 $0.00 Draft CTP
676 US 15-501/Southwest Durham Dr New Interchange 0 0 Southwest Durham Dr US 15-501 $0.00 Draft CTP. US 15-501 Plan.
70.2 NC 54/Farrington Rd New Grade Separation 0 6 NC 54 Farrington Rd $2,325,000.00 U-5774E. Costs in U-5774F. No $ in STIP
640 I-40/New Hope Common Dr Ext New Grade Separation 0 0 New Hope Common Dr Ext I-40 $0.00 See 15-501 Study & SW Dur Collector Street Plan
630 I-40/Danzier Dr New Grade Separation 0 0 Danzier Dr I-40 $0.00 See 15-501 Plan & SW Dur Collector Street Plan
662 Orange Grove Connector/NCRR New Grade Separation 0 0 NC Rail Road Orange Grove Connector $0.00 Draft CTP
648 I-85/New Collector (Hillsborough) New Grade Separation 0 0 New Collector Road I-85 $0.00 Hboro will finance
604 Dimmocks Mill Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Dimmocks Mill Rd $11,600,000.00 High Hboro priority; upgraded to 2045
660 Neal Rd/NCRR New Grade Separation 0 0 NCRR (railroad tracks) Neal Rd $5,300,000.00 Draft CTP
644 I-85/Alston Av Extension New Grade Separation 0 0 Alston Av Extension I-85 $0.00 Draft CTP
Page 9 of 16