© Copyright 2024 - DCHC MPO
4307 Emperor Blvd., Suite 110
Durham, NC 27703
919.560.4366
Site Map
TIP Projects Start new search
Project List
TIP # | Project Name | Description | Project Expected Start Date | Total Cost |
TM-0002 | Statewide 5311 and 5311(F) Funds | NCDOT - INTEGRATED MOBILITY DIVISION STATE ADMINISTRATION - FUNDS TO SUPPORT THE IMD WITH PROVIDING SUBRECIPIENT MONITORING AND OVERSIGHT AND PROVIDE TECHNICAL ASSISTANCE IN THE DEVELOPMENT OF PROJECTS AND PLANS FOR SMALL URBAN AND RURAL AREAS. (5311 ADMIN/ OPERATING/ CAPITAL AND 5311(F)). | 2023 | $3,950,000 |
TM-0004 | Statewide 5311 Capital ADTAP Funds | NCDOT - INTEGRATED MOBILITY DIVISION STATE ADMINISTRATION - FUNDS TO SUPPORT THE IMD WITH PROVIDING SUBRECIPIENT MONITORING AND OVERSIGHT AND PROVIDE TECHNICAL ASSISTANCE IN THE DEVELOPMENT OF PROJECTS AND PLANS FOR SMALL URBAN AND RURAL AREAS.(5311 CAPITAL - ADTAP) | 2023 | $150,000 |
TM-0038 | Statewide ARP/Covid Response and Relief Supplementation Appropriations Act Funds | NCDOT-IMD STATE ADMINISTRATION - AMERICAN RESCUE PLAN AND CORONA VIRUS RESPONSE AND RELIEF SUPPLEMENTAL APPROPRIATIONS ACT FUND TO SUPPORT | 2023 | $1,501,000 |
HE-0007A | SR 1004 (OLD OXFORD ROAD) | SR 1004 (OLD OXFORD ROAD), FIRST AVE (MERCK DRIVEWAY). CONSTRUCT RIGHT TURN LANE. | 2023 | $190,000 |
HE-0007B | SR 1794 (TEKNIKA PARKWAY) | SR 1794 (TEKNIKA PARKWAY), SR 1632 (RED MILL ROAD) CONSTRUCT TURN LANES AND SIGNALIZE INTERSECTION. | 2023 | $1,000,000 |
HE-0007C | SR 2635 (INTERNATIONAL DRIVE) | SR 2635 (INTERNATIONAL DRIVE), SR 1004 (OLD OXFORD RD) TO NEW LOCATION. CONSTRUCT NEW LANES. | 2023 | $600,000 |
EL-4828A | Morgan Creek Greenway Phase 1 (Carrboro) | Western section, SR 1919 (Smith Level Road) to University Lake in Carrboro. Construct greenway and connections. As part of TIP Amendment #6, Phase 2 was deleted. Planning, design, right of way, and construction for this project are by the Town of Carrboro. | 2023 | $1,567,500 |
HL-0045 | Exchange Park Lane Bridge Repair | EXCHANGE PARK LANE, SOUTH CHURTON STREET TO FARIBAULT LANE IN HILLSBOROUGH. REPAIR BRIDGE 670241 OVER ENO RIVER | 2023 | $153,000 |
HS-2005C | NC 54/NC 55 Pedestrian Refuge Islands | NC 55 IN DURHAM. INSTALL CONCRETE PEDESTRIAN REFUGE ISLANDS IN ALL QUADRANTS. | 2023 | $75,000 |
P-5706 | East Durham Siding Norfolk Southern H Line | Construction of East Durham Railroad Safety Project. Project will straighten existing railroad curvature between CP Nelson and CP East Durham. Also includes a combination of grade separations and closures at three crossings: Ellis Road - south end (734737A), Glover Road (734735L), and Wrenn Road (734736T). | 2023 | $47,648,000 |
U-4727 | UPWP: MPO LPA | DCHC MPO Lead Planning Agency UPWP. DCHC MPO Planning Allocation and Work Program. | 2023 | $27,818,089 |
TU-0014 | ITRE Technical Assistance to IMD | NCDOT, NCSU (ITRE) WILL PROVIDE TECHNICAL ASSISTANCE TO THE INTEGRATED MOBILITY DIVISION AND SUBRECIPIENTS. | 2023 | $634,000 |
TU-0015 | ITRE ADA Training | 2023 | $73,000 | |
BL-0070 | Chatham County Pedestrian Safety Improvements | Chatham County is requesting to utilize its STBGDA funds to give to NCDOT for three pedestrian safety projects. We have received HILC funds from Division 8 for $17,500 to partially cover the local match, and the county will providing the rest. Compiled into one total project, we will be giving $139,866 to NCDOT to help carry out 3 bike/ped safety projects around the county. The non-federal match required is $34,966.50. These projects will require no ROW acquisition. | 2023 | $180,133 |
EB-5703 | LaSalle Street Sidewalks | Construct sidewalks on both sides of LaSalle Street from Kangaroo Drive to US 70 Business (Hillsborough Road) and on one-side of LaSalle Street from Hillsborough Road to Sprunt Avenue. Planning, design, right of way, and construction by the City of Durham. | 2023 | $1,955,000 |
Page 15 of 37