TIP # | Project Name | Description | Project Expected Start Date | Total Cost |
TL-0027 | NC 54 Falconbridge Transit Access | The NC 54-Falconbridge construction project aims to address critical transit access and transit operation safety concerns along NC 54 in the Falconbridge area in southwestern Durham County, thereby increasing transit ridership and reducing emissions. The project is located within City of Durham city limits from Farrington Road to Huntingridge Road. The project will provide safe pedestrian connections for transit users to existing and planned signalized crossings in this corridor, given the high speeds and traffic volumes on NC 54. The project includes construction of bus stop landing pads, shelters, benches, bus pullouts and tapers, sidewalk, curb and gutter, curb ramps, crosswalks, pedestrian median refuge islands, appropriate safety signage, pedestrian signal heads and complimentary traffic signal modifications, and other supporting roadway modifications. | 2023 | $1,135,900 |
U-5774B | NC 54 Improvements - Fordham to Barbee Chapel | The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break B for this project is improvements to NC 54 from US 15/501 (Fordham Boulevard) in Orange County to SR 1110 (Barbee Chapel Rd) in Durham County, upgrade the roadway corridor and convert at-grade intersection with SR 1110 (Barbee Chapel Rd) to interchange. | 2027 | $59,234,000 |
R-5821A | NC 54 Operational Improvements | Construct operational improvements, including bicycle/pedestrian accommodations, from SR 1006 (Orange Grove Road) ro ST1107/1937 (Old Fayetteville Road). | 2026 | $50,040,000 |
BL-0044 | NC 54 Pedestrian Improvements | NC 54, WESTBROOK DRIVE IN CARRBORO TO WEST OF US 15 / US 501 / NC 86 (SOUTH COLUMBIA STREET) INTERCHANGE IN CHAPEL HILL. CONSTRUCT SIDEWALK AND INSTALL PEDESTRIAN SIGNALS, CROSSWALK | 2022 | $1,486,000 |
EB-5994 | NC 54 Sidepath | Construct a sidepath along north side of NC 54 from James Street to Anderson Park in Carrboro. | 2024 | $1,469,000 |
EB-5708 | NC 54 Sidewalks | Construct sections of sidewalk on south side of NC 54, from NC 55 to Research Triangle Park western limit in Durham. Planning, design, right of way, and construction by the City of Durham. Project is currently in progress for ROW. | Prior Year | $767,000 |
U-5774C | NC 54 Upgrades - Barbee Chapel to I-40 | Entire project is to Upgrade NC 54 from Fordham Boulevard in Orange County to NC 55 in Durham County. Break C is to upgrade NC 54 from Barbee Chapel Road in Orange County to I-40 in Durham County. | 2029 | $28,576,000 |
U-5774F | NC 54 Upgrades - Grade Separations at Falconbridge, Farrington, and I-40 | The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break F of the project is the I-40/NC 54 interchange improvements, which include grade separations at Falconbridge and Farrington roads. Previous breaks D and E were incorporated into break F in P4.0. | 2029 | $3,793,000 |
U-5774A | NC 54,US 15/ US 501 Upgrade Interchange | Future Unfunded | $19,040,000 | |
HS-2005C | NC 54/NC 55 Pedestrian Refuge Islands | NC 55 IN DURHAM. INSTALL CONCRETE PEDESTRIAN REFUGE ISLANDS IN ALL QUADRANTS. | 2023 | $75,000 |
U-3308 | NC 55 (Alston Ave) | From NC 147 (Durham Freeway) to US 70 Business/ NC 98 (Holloway St) in Durham. Widen from four-lane divided facility from NC 147 to Main Street and replace Norfolk Southern railroad bridges. Modernize from Main Street to US 70 Business/ NC 98 (Holloway St) including addition of on-street parking, bicycle lanes, turn lanes, median, and access management. Right of way for this project is in progress. Amendment #1 to FY18-27 TIP added STBGDA funds for bicycle and pedestrian enhancements. | Prior Year | $41,392,996 |
HS-2005M | NC 55 (Alston Avenue) Pedestrian Infrastructure at NC 55 and Geer Street | NC 55 (ALSTON AVENUE), AT SR 1670 (GEER STREET). REVISE TRAFFIC SIGNAL AND INSTALL PEDESTRIAN SIGNAL HEADS. | 2023 | $62,000 |
U-6118 | NC 55 Southbound Lane | Add third southbound lane on NC 55 from Meridian Parkway to I-40. Upgrade I-40 ramp terminals. | 2028 | $3,100,000 |
U-5745 | NC 751 (Hope Valley Road) | SR 1183 (University Dr) intersection in Durham. Construct a roundabout. Coordinate with EB-5514. | Prior Year | $4,385,000 |
EB-5514 | NC 751 / SR 1183 / SR 2220 | Add bicycle lanes and pedestrian improvements along NC 751 from SR 1116 (Garrett Road) to SR 1158 (Cornwallis Road) in Durham. Planning, design, right of way, and construction are in progress by the City of Durham. | 2018 | $1,930,611 |