Project List

TIP # Project Name Description Project Expected Start Date Total Cost
U-4726HJ NC 751 and NC 54 Sidewalks Construction of sidewalks on NC 751 between Garrett Rd and NC 54, and on NC 54 between NC 751 and Dresden Drive. This project was previously part of ER-2971, the NCDOT's Sidewalk Program in all fourteen highway divisions. 2016 $502,308
EB-5514 NC 751 / SR 1183 / SR 2220 Add bicycle lanes and pedestrian improvements along NC 751 from SR 1116 (Garrett Road) to SR 1158 (Cornwallis Road) in Durham. Planning, design, right of way, and construction are in progress by the City of Durham. 2018 $1,930,611
U-5745 NC 751 (Hope Valley Road) SR 1183 (University Dr) intersection in Durham. Construct a roundabout. Coordinate with EB-5514. Prior Year $4,385,000
U-6118 NC 55 Southbound Lane Add third southbound lane on NC 55 from Meridian Parkway to I-40. Upgrade I-40 ramp terminals. 2028 $3,100,000
HS-2005M NC 55 (Alston Avenue) Pedestrian Infrastructure at NC 55 and Geer Street NC 55 (ALSTON AVENUE), AT SR 1670 (GEER STREET). REVISE TRAFFIC SIGNAL AND INSTALL PEDESTRIAN SIGNAL HEADS. 2023 $62,000
U-3308 NC 55 (Alston Ave) From NC 147 (Durham Freeway) to US 70 Business/ NC 98 (Holloway St) in Durham. Widen from four-lane divided facility from NC 147 to Main Street and replace Norfolk Southern railroad bridges. Modernize from Main Street to US 70 Business/ NC 98 (Holloway St) including addition of on-street parking, bicycle lanes, turn lanes, median, and access management. Right of way for this project is in progress. Amendment #1 to FY18-27 TIP added STBGDA funds for bicycle and pedestrian enhancements. Prior Year $41,392,996
HS-2005C NC 54/NC 55 Pedestrian Refuge Islands NC 55 IN DURHAM. INSTALL CONCRETE PEDESTRIAN REFUGE ISLANDS IN ALL QUADRANTS. 2023 $75,000
U-5774A NC 54,US 15/ US 501 Upgrade Interchange Future Unfunded $19,040,000
U-5774F NC 54 Upgrades - Grade Separations at Falconbridge, Farrington, and I-40 The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break F of the project is the I-40/NC 54 interchange improvements, which include grade separations at Falconbridge and Farrington roads. Previous breaks D and E were incorporated into break F in P4.0. 2029 $3,793,000
U-5774C NC 54 Upgrades - Barbee Chapel to I-40 Entire project is to Upgrade NC 54 from Fordham Boulevard in Orange County to NC 55 in Durham County. Break C is to upgrade NC 54 from Barbee Chapel Road in Orange County to I-40 in Durham County. 2029 $28,576,000
EB-5708 NC 54 Sidewalks Construct sections of sidewalk on south side of NC 54, from NC 55 to Research Triangle Park western limit in Durham. Planning, design, right of way, and construction by the City of Durham. Project is currently in progress for ROW. Prior Year $767,000
EB-5994 NC 54 Sidepath Construct a sidepath along north side of NC 54 from James Street to Anderson Park in Carrboro. 2024 $1,469,000
BL-0044 NC 54 Pedestrian Improvements NC 54, WESTBROOK DRIVE IN CARRBORO TO WEST OF US 15 / US 501 / NC 86 (SOUTH COLUMBIA STREET) INTERCHANGE IN CHAPEL HILL. CONSTRUCT SIDEWALK AND INSTALL PEDESTRIAN SIGNALS, CROSSWALK 2022 $1,486,000
R-5821A NC 54 Operational Improvements Construct operational improvements, including bicycle/pedestrian accommodations, from SR 1006 (Orange Grove Road) ro ST1107/1937 (Old Fayetteville Road). 2026 $50,040,000
U-5774B NC 54 Improvements - Fordham to Barbee Chapel The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break B for this project is improvements to NC 54 from US 15/501 (Fordham Boulevard) in Orange County to SR 1110 (Barbee Chapel Rd) in Durham County, upgrade the roadway corridor and convert at-grade intersection with SR 1110 (Barbee Chapel Rd) to interchange. 2027 $59,234,000
Page 17 of 37