© Copyright 2024 - DCHC MPO
4307 Emperor Blvd., Suite 110
Durham, NC 27703
919.560.4366
Site Map
TIP Projects Start new search
Project List
TIP # | Project Name | Description | Project Expected Start Date | Total Cost |
U-5937 | NC 147 auxiliary lanes from South Duke Street to Briggs Avenue | Construct auxiliary lanes and operational improvements on NC 147 from South Duke Street to Briggs Avenue. Amendment #7 to the FY2018-2027 TIP extended the western terminus to Chapel Hill Street. | 2027 | $58,088,000 |
U-5934 | NC-147 Widening, East End Connector to I-40 | Add lanes and rehabilitate pavement on NC-147 from the East End Connector to I-40. | 2028 | $179,248,000 |
U-5854 | SR 1008 (Mt. Carmel Church Rd) | SR 1913 (Bennett Rd) in Chapel Hill. Construct roundabout and related safety improvements. Planning and design for this project are in progress. | Prior Year | $1,025,000 |
U-5846 | SR 1772 (Greensboro Street) | SR 1780 (Estes Drive) in Carrboro, construct a roundabout. | Prior Year | $3,185,000 |
U-5845 | South Churton Street (SR 1009) Widening | SR 1009 (SOUTH CHURTON STREET), I-40 TO ENO RIVER IN HILLSBOROUGH. WIDEN TO MULTILANES. | 2026 | $59,599,000 |
U-5823 | Woodcroft Parkway Extension | SR 1116 (Garrett Rd) to NC 751 (Hope Valley Rd) in Durham. Construct roadway on new alignment. Planning, design, right of way, and construction by the City of Durham. Non-state system facility, local match by City of Durham. | 2024 | $5,050,000 |
U-5774F | NC 54 Upgrades - Grade Separations at Falconbridge, Farrington, and I-40 | The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break F of the project is the I-40/NC 54 interchange improvements, which include grade separations at Falconbridge and Farrington roads. Previous breaks D and E were incorporated into break F in P4.0. | 2029 | $3,793,000 |
U-5774C | NC 54 Upgrades - Barbee Chapel to I-40 | Entire project is to Upgrade NC 54 from Fordham Boulevard in Orange County to NC 55 in Durham County. Break C is to upgrade NC 54 from Barbee Chapel Road in Orange County to I-40 in Durham County. | 2029 | $28,576,000 |
U-5774B | NC 54 Improvements - Fordham to Barbee Chapel | The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break B for this project is improvements to NC 54 from US 15/501 (Fordham Boulevard) in Orange County to SR 1110 (Barbee Chapel Rd) in Durham County, upgrade the roadway corridor and convert at-grade intersection with SR 1110 (Barbee Chapel Rd) to interchange. | 2027 | $59,234,000 |
U-5774A | NC 54,US 15/ US 501 Upgrade Interchange | Future Unfunded | $19,040,000 | |
U-5745 | NC 751 (Hope Valley Road) | SR 1183 (University Dr) intersection in Durham. Construct a roundabout. Coordinate with EB-5514. | Prior Year | $4,385,000 |
U-5720C | US 70 (Miami Boulevard) Upgrades | SR 1959 (SOUTH MIAMI BOULEVARD) / SR 1811 (SHERRON ROAD) TO EAST OF SR 2095 (PAGE ROAD EXTENSION). | Future Unfunded | $68,100,000 |
U-5720B | US 70 (Miami Boulevard) Upgrades - Miami Boulevard Intersection Improvements | Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. | 2027 | $94,800,000 |
U-5720A | US 70 (MIAMI BOULEVARD), LYNN ROAD TO EAST OF SR 2095 (PAGE ROAD EXTENSION). | Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. | 2027 | $62,700,000 |
U-5717 | US 15/501 (and Garrett Road) | SR 1116 Garrett Road in Durham. Convert the existing at-grade intersection to an interchange. | 2026 | $32,000,000 |
Page 5 of 37