Project List

TIP # Project Name Description Project Expected Start Date Total Cost
I-5707 I-40 Auxiliary Lane Construct westbound auxiliary lane along I-40 from NC 55 to NC 147. Planning and design for this project are in progress. Prior Year $10,660,000
M-0534SW Hydraulics, Statewide Preliminary engineering for the HFP to facilitate FEMA and NFIP compliance and flood resilience. Prior Year $8,000,000
M-0392SW Hydraulics, Statewide Preliminary hydraulics engineering for miscellaneous statewide projects. Prior Year $2,248,000
M-0534REG Hydraulics, Regional Preliminary engineering for the HFP to facilitate FEMA and NFIP compliance and flood resilience. Prior Year $6,000,000
M-0392REG Hydraulics, Regional Preliminary hydraulics engineering for miscellaneous regional projects. Prior Year $1,686,000
M-0534DIV Hydraulics, Division Preliminary engineering for the highway floodplain program (HFP) to facilitate FEMA and NFIP compliance and flood resilience. Prior Year $6,000,000
M-0392DIV Hydraulics, Division Preliminary hydraulics engineering for miscellaneous division projects. Prior Year $1,686,000
BL-0063 Horton Road Sidewalk The Horton Road Pedestrian project seeks to construct a 1.59-mile multi-use path along the south side of Horton Road in Durham from Guess Road to Roxboro Road. Construct a 0.41-mile sidewalk on the north side of Horton Road from Guess Road to connect to an existing sidewalk near Horton Road. This will provide a safe pedestrian option along a busy road in northern Durham and connect residential areas to shopping centers and other destinations. It focuses on connecting lower-income residential areas to shopping areas and reduces the need to access these areas with an automobile. 2023 $1,205,667
U-4726DE Homestead-CHHS Multi-use Path Construct a greenway trail from Homestead Road to Chapel Hill High School. This is an extension of the existing Bolin Creek Greenway trail. Prior Year $1,494,126
U-4726IK Homestead Road Sidewalks Construct sidewalks along Homestead Road in Chapel Hill. 2021 $1,300,000
TD-5294 Holloway Street Transit Corridor Construct bus stop improvements and better access to bus stops along NC 98 (Holloway Street). Prior Year $1,166,000
P-5701 Hillsborough Rail Station: Norfolk Southern H Line Passenger Rail Station for Norfolk Southern H Line. Milepost 41.7 in Hillsborough. Construct platform, passenger rail station building, site access, utilities, and parking. Coordinate with U-5848. "Other" funding reflects participation by GoTriangle, formerly Triangle Transit. $0
P-5701B Hillsborough Passenger Rail Station Platform Construction and Realign Curve Hillsborough Passenger Rail Station Platform Construction and Realign Curve at Milepost 41.4 2023 $1,000,000
P-5701A Hillsborough Passenger Rail Station Building, Site Access, Utilities and Parking 2022 $6,860,000
TD-5295 Hillsborough Park and Ride Construct a park and ride facility in the Town of Hillsborough. 2023 $920,000
Page 21 of 37