Project List

TIP # Project Name Description Project Expected Start Date Total Cost
M-0552CREG Digital Delivery Initiative (Regional) Various, digital delivery initiative 2023 $150,000
M-0552CSW Digital Delivery Initiative (Statewide): Various, digital delivery initiative 2023 $200,000
M-0557A Statewide Hazard Categorization and Warning Tools Statewide, hazard characterization and warning tools. 2023 $3,360,000
M-0557B Statewide Hazard Corridor Vulnerability Assessments Statewide, hazard corridor vulnerability assessments 2023 $1,400,000
M-0557C Statewide Geotechnical Asset Management Database and Landslide Mitigation Geotechnical asset management (GAM) database and landslide mitigation planning 2023 $2,240,000
BL-0063 Horton Road Sidewalk The Horton Road Pedestrian project seeks to construct a 1.59-mile multi-use path along the south side of Horton Road in Durham from Guess Road to Roxboro Road. Construct a 0.41-mile sidewalk on the north side of Horton Road from Guess Road to connect to an existing sidewalk near Horton Road. This will provide a safe pedestrian option along a busy road in northern Durham and connect residential areas to shopping centers and other destinations. It focuses on connecting lower-income residential areas to shopping areas and reduces the need to access these areas with an automobile. 2023 $1,205,667
P-5701B Hillsborough Passenger Rail Station Platform Construction and Realign Curve Hillsborough Passenger Rail Station Platform Construction and Realign Curve at Milepost 41.4 2023 $1,000,000
R-5753 Federal Lands Transportation Program (FLTP) Federal Lands Transportation Program (FLTP). Road and bridge improvements to be constructed on transportation facilities that are owned by the federal government that provide access to federal lands. This program is in progress. 2023 $59,711,000
R-5966 Federal Tribal Transportation Program (FTTP) Road and Bridge Improvements Federal Tribal Transportation Program (FTTP) road and bridge improvements to be constructed on transportation facilities owned by the federal government that provide access to tribal lands. 2023 $16,914,000
TC-0018 NCDOT 5310 Capital Projects for Rural Non-Transit Projects NCDOT, 5310 CAPITAL PROJECTS FOR RURAL AND URBAN AREAS. 2023 $6,975,000
TL-0018 15-501 Bus Stop Improvements GoTriangle Access Improvements along US 15-501 in Orange County between I-40 and Franklin St. 2023 $500,000
TL-0026 Orange County Transportation Services Bus Shelters Update three bus shelters in Orange County on government property. 2023 $125,000
TL-0027 NC 54 Falconbridge Transit Access The NC 54-Falconbridge construction project aims to address critical transit access and transit operation safety concerns along NC 54 in the Falconbridge area in southwestern Durham County, thereby increasing transit ridership and reducing emissions. The project is located within City of Durham city limits from Farrington Road to Huntingridge Road. The project will provide safe pedestrian connections for transit users to existing and planned signalized crossings in this corridor, given the high speeds and traffic volumes on NC 54. The project includes construction of bus stop landing pads, shelters, benches, bus pullouts and tapers, sidewalk, curb and gutter, curb ramps, crosswalks, pedestrian median refuge islands, appropriate safety signage, pedestrian signal heads and complimentary traffic signal modifications, and other supporting roadway modifications. 2023 $1,135,900
TM-0043 Electric Transit Buses - City of Durham The City of Durham will acquire six (6) electric transit buses. 2023 $2,280,000
TM-0023 NCDOT IMD State Administration Funds NCDOT, INTEGRATED MOBILITY DIVISION STATE ADMINISTRATION FUNDS TO SUPPORT THE IMD WITH PROVIDING SUBRECIPIENT MONITORING AND OVERSIGHT AND PROVIDE TECHNICAL ASSISTANCE IN THE DEVELOPMENT OF PROJECTS AND PLANS FOR SMALL URBAN AND RURAL AREAS(5310 ADMIN/OPERATING/CAPITAL PURCHASE SERVICE) 2023 $1,022,000
Page 22 of 37