Project List

TIP # Project Name Description Project Expected Start Date Total Cost
M-0479BDIV Statewide Project Development and Environmental Analysis (Division) Statewide Project Development and Environmental Analysis Preliminary Engineering for Atlas Environmental Unit Groups. 2021 $1,350,000
M-0479BREG Statewide Project Development and Environmental Analysis (Regional) Statewide Project Development and Environmental Analysis Preliminary Engineering for Atlas Environmental Unit Groups. 2021 $1,350,000
TM-0031 NCDOT RTAP Statewide Funds for FTA Grants NCDOT, RTAP STATEWIDE FUNDS FOR FTA GRANTS 2023 $1,348,000
B-5348 Sr 1005 (Old Greensboro Rd) (Bridge) Replace bridge No. 85 over Phil's Creek. Project is under construction. Prior Year $1,345,000
U-4726IK Homestead Road Sidewalks Construct sidewalks along Homestead Road in Chapel Hill. 2021 $1,300,000
M-0563D LIDAR Data Collection 2023 $1,285,000
C-5184 Riverwalk Trail Riverwalk Trail, Phase III in Hillsborough. Construct a paved off-road trail along Eno River connecting River Park, Gold Park, and the Occoneechee Mountain State Natural Area, and construct sidewalk to provide pedestrian and bicycle connections to the greenway. Planning, design, right of way, and construction are in progress by the Town of Hillsborough. Prior Year $1,258,563
HV-0001 Electric Vehicle Supply Equipment VARIOUS, CONSTRUCTION OF ELECTRIC VEHICLE SUPPLY EQUIPMENT ALONG NORTH CAROLINA'S ALTERNATIVE CORRIDORS 2023 $1,221,000
BL-0028 Durham Bike Facilities II WEST CLUB BOULEVARD, WASHINGTON STREET TO SR 1322 (BROAD STREET); BLACKWELL STREET / CORCORAN STREET / FOSTER STREET, AT TRAILHEAD TO WASHINGTON STREET; SR 1127 (CHAPEL HILL STREET), RAMSEUR STREET TO SWIFT AVENUE IN DURHAM. CONSTRUCT BUFFERED BICYCLE LANES. 2022 $1,211,795
BL-0063 Horton Road Sidewalk The Horton Road Pedestrian project seeks to construct a 1.59-mile multi-use path along the south side of Horton Road in Durham from Guess Road to Roxboro Road. Construct a 0.41-mile sidewalk on the north side of Horton Road from Guess Road to connect to an existing sidewalk near Horton Road. This will provide a safe pedestrian option along a busy road in northern Durham and connect residential areas to shopping centers and other destinations. It focuses on connecting lower-income residential areas to shopping areas and reduces the need to access these areas with an automobile. 2023 $1,205,667
TD-5294 Holloway Street Transit Corridor Construct bus stop improvements and better access to bus stops along NC 98 (Holloway Street). Prior Year $1,166,000
TL-0027 NC 54 Falconbridge Transit Access The NC 54-Falconbridge construction project aims to address critical transit access and transit operation safety concerns along NC 54 in the Falconbridge area in southwestern Durham County, thereby increasing transit ridership and reducing emissions. The project is located within City of Durham city limits from Farrington Road to Huntingridge Road. The project will provide safe pedestrian connections for transit users to existing and planned signalized crossings in this corridor, given the high speeds and traffic volumes on NC 54. The project includes construction of bus stop landing pads, shelters, benches, bus pullouts and tapers, sidewalk, curb and gutter, curb ramps, crosswalks, pedestrian median refuge islands, appropriate safety signage, pedestrian signal heads and complimentary traffic signal modifications, and other supporting roadway modifications. 2023 $1,135,900
W-5708SW Division 8 Safety Improvements Safety improvements at various locations in Division 8. Add right-of-way and construction phases that were not previously programmed. 2016 $1,120,000
U-4727 UPWP: GoTriangle GoTriangle UPWP. DCHC MPO Planning Allocation and Work Program. 2016 $1,085,000
TK-6126 Administration - Durham County ACCESS Administration. 5317 New Freedom. Prior Year $1,083,000
Page 23 of 37