Project List

TIP # Project Name Description Project Expected Start Date Total Cost
TL-0018 15-501 Bus Stop Improvements GoTriangle Access Improvements along US 15-501 in Orange County between I-40 and Franklin St. 2023 $500,000
TL-0026 Orange County Transportation Services Bus Shelters Update three bus shelters in Orange County on government property. 2023 $125,000
TL-0027 NC 54 Falconbridge Transit Access The NC 54-Falconbridge construction project aims to address critical transit access and transit operation safety concerns along NC 54 in the Falconbridge area in southwestern Durham County, thereby increasing transit ridership and reducing emissions. The project is located within City of Durham city limits from Farrington Road to Huntingridge Road. The project will provide safe pedestrian connections for transit users to existing and planned signalized crossings in this corridor, given the high speeds and traffic volumes on NC 54. The project includes construction of bus stop landing pads, shelters, benches, bus pullouts and tapers, sidewalk, curb and gutter, curb ramps, crosswalks, pedestrian median refuge islands, appropriate safety signage, pedestrian signal heads and complimentary traffic signal modifications, and other supporting roadway modifications. 2023 $1,135,900
TL-0034 Electric Transit Buses - Chapel Hill The Town of Chapel Hill will acquire five (5) electric transit buses. 2023 $2,708,000
TL-0035 North South Bus Rapid Transit (NSBRT) NSBRT is an 8.2 mile proposed bus rapid transit system, that will connect 2 park and ride lots to downtown Chapel Hill, the University of North Carolina at Chapel Hill, and UNC Hospitals. Connections will also be made with regional transit providers GoTriangle and PART. NSBRT will operate in a constructed curb running lane, a converted curb running lane, and in mixed traffic, while serving 17 station areas that will feature the latest in technologies and passenger amenities, with 60 foot articulated electric vehicles. Where applicable, a multi-use path will be installed to provide options for active transportation. The project is in the early stages of 60% design awaiting completion of NEPA which is expected in early 2023. NSBRT has an expectant project cost of $150.7M, with $120.5M planned from the Small Starts Process. The project non-cig funding is provided by the Orange County Transit Plan for a total of $29.1M. NSBRT is planned to open for revenue service in 2028. 2023 $10,736,879
TM-0002 Statewide 5311 and 5311(F) Funds NCDOT - INTEGRATED MOBILITY DIVISION STATE ADMINISTRATION - FUNDS TO SUPPORT THE IMD WITH PROVIDING SUBRECIPIENT MONITORING AND OVERSIGHT AND PROVIDE TECHNICAL ASSISTANCE IN THE DEVELOPMENT OF PROJECTS AND PLANS FOR SMALL URBAN AND RURAL AREAS. (5311 ADMIN/ OPERATING/ CAPITAL AND 5311(F)). 2023 $3,950,000
TM-0004 Statewide 5311 Capital ADTAP Funds NCDOT - INTEGRATED MOBILITY DIVISION STATE ADMINISTRATION - FUNDS TO SUPPORT THE IMD WITH PROVIDING SUBRECIPIENT MONITORING AND OVERSIGHT AND PROVIDE TECHNICAL ASSISTANCE IN THE DEVELOPMENT OF PROJECTS AND PLANS FOR SMALL URBAN AND RURAL AREAS.(5311 CAPITAL - ADTAP) 2023 $150,000
TM-0010 Statewide 5307 Operating Funds 2021 $142,000
TM-0012 Statewide 5307 Operating Funds 2021 $129,000
TM-0014 Statewide 5307 Operating Funds 2021 $75,000
TM-0015 Statewide 5307 Operating Funds 2021 $145,000
TM-0020 Statewide 5307 Operating Funds 2023 $2,146,000
TM-0022 Statewide 5307 Operating Funds 2021 $18,000
TM-0023 NCDOT IMD State Administration Funds NCDOT, INTEGRATED MOBILITY DIVISION STATE ADMINISTRATION FUNDS TO SUPPORT THE IMD WITH PROVIDING SUBRECIPIENT MONITORING AND OVERSIGHT AND PROVIDE TECHNICAL ASSISTANCE IN THE DEVELOPMENT OF PROJECTS AND PLANS FOR SMALL URBAN AND RURAL AREAS(5310 ADMIN/OPERATING/CAPITAL PURCHASE SERVICE) 2023 $1,022,000
TM-0024 FTA AIM Grant Opportunity DISCRETIONARY GRANT AWARDED BY FTA. THIS WILL ALLOW THE CITY TO EXPAND SERVICE AND HOURS. $0