Project List

TIP # Project Name Description Project Expected Start Date Total Cost
U-5518 US 70 Upgrade Upgrade US 70 from west of TW Alexander Drive (SR 3067) to I-540 in Raleigh to improve capacity, safety, and traffic operations including interchanges at various locations. 2025 $392,603,000
U-5543 Variable Message Signs in Chapel Hill Variable message signs for traffic management on major corridors in Chapel Hill. Construction is in progress by the Town of Chapel Hill. 2016 $1,626,250
U-5550 US 15/501 (Fordham Boulevard) Intersection Improvements at US 15/501 and SR 1742 Ephesus Church Road in Chapel Hill. Planning, design, ROW, and construction by the Town of Chapel Hill. FY 2018 programming reflects the reimbursement to the Town. 2018 $2,170,000
U-5717 US 15/501 (and Garrett Road) SR 1116 Garrett Road in Durham. Convert the existing at-grade intersection to an interchange. 2026 $32,000,000
U-5720A US 70 (MIAMI BOULEVARD), LYNN ROAD TO EAST OF SR 2095 (PAGE ROAD EXTENSION). Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. 2027 $62,700,000
U-5720B US 70 (Miami Boulevard) Upgrades - Miami Boulevard Intersection Improvements Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. 2027 $94,800,000
U-5720C US 70 (Miami Boulevard) Upgrades SR 1959 (SOUTH MIAMI BOULEVARD) / SR 1811 (SHERRON ROAD) TO EAST OF SR 2095 (PAGE ROAD EXTENSION). Future Unfunded $68,100,000
U-5745 NC 751 (Hope Valley Road) SR 1183 (University Dr) intersection in Durham. Construct a roundabout. Coordinate with EB-5514. Prior Year $4,385,000
U-5774A NC 54,US 15/ US 501 Upgrade Interchange Future Unfunded $19,040,000
U-5774B NC 54 Improvements - Fordham to Barbee Chapel The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break B for this project is improvements to NC 54 from US 15/501 (Fordham Boulevard) in Orange County to SR 1110 (Barbee Chapel Rd) in Durham County, upgrade the roadway corridor and convert at-grade intersection with SR 1110 (Barbee Chapel Rd) to interchange. 2027 $59,234,000
U-5774C NC 54 Upgrades - Barbee Chapel to I-40 Entire project is to Upgrade NC 54 from Fordham Boulevard in Orange County to NC 55 in Durham County. Break C is to upgrade NC 54 from Barbee Chapel Road in Orange County to I-40 in Durham County. 2029 $28,576,000
U-5774F NC 54 Upgrades - Grade Separations at Falconbridge, Farrington, and I-40 The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break F of the project is the I-40/NC 54 interchange improvements, which include grade separations at Falconbridge and Farrington roads. Previous breaks D and E were incorporated into break F in P4.0. 2029 $3,793,000
U-5823 Woodcroft Parkway Extension SR 1116 (Garrett Rd) to NC 751 (Hope Valley Rd) in Durham. Construct roadway on new alignment. Planning, design, right of way, and construction by the City of Durham. Non-state system facility, local match by City of Durham. 2024 $5,050,000
U-5845 South Churton Street (SR 1009) Widening SR 1009 (SOUTH CHURTON STREET), I-40 TO ENO RIVER IN HILLSBOROUGH. WIDEN TO MULTILANES. 2026 $59,599,000
U-5846 SR 1772 (Greensboro Street) SR 1780 (Estes Drive) in Carrboro, construct a roundabout. Prior Year $3,185,000
Page 32 of 37