Project List

TIP # Project Name Description Project Expected Start Date Total Cost
EB-5886A Estes Drive Bike/Ped - Carrboro Construct bike/ped improvements on Estes Drive from North Greensboro Street to south of the railroad tracks in Carrboro. Planning, design, and ROW managed by the Town of Carrboro. Amendment #4 to the FY18-27 TIP broke the projects into A and B sections. Section A is in Carrboro from North Greensboro Street to south of the railroad tracks. Section B is in Chapel Hill from south of the railroad tracks to NC 86. Connects to Frances Shetley Bikeway. 2022 $1,063,804
EB-5880 Jones Ferry Road Sidewalk Construct a sidewalk on the north side of SR 1005 (Jones Ferry Road) from SR 1010 (West Main Street) to Davie Road in Carrboro. 2023 $561,000
EB-5837 Third Fork Creek Trail Construct a shared use path and sidewalks in Durham from Southern Boundaries Park to the American Tobacco Trail. Install a beacon at SR 1158 (Cornwallis Road). This is an extension of the existing Third Fork Creek Trail. Planning, design, ROW, and construction managed by the City of Durham. 2018 $3,799,092
EB-5835 Alston Avenue Sidewalks Construct sidewalk on east side of NC 55 (Alston Avenue) from SR 1171 (Riddle Road) to Cecil Street in Durham. Fill in missing gaps. 2025 $1,351,014
EB-5834 Guess Road Sidewalks Construct sidewalks on both sides of NC 157 (Guess Road) from SR 1407 (West Carver Street) to Hillcrest Drive in Durham. 2019 $1,614,906
EB-5721 Fordham Blvd Sidepath (Orange County Bicycle Route 1) - Cleland Dr to Willow Dr Construct trail along US 15/501 Fordham Blvd from Cleland Drive to Willow Drive in Chapel Hill. Upgrade existing off-road path located along US 15/US 501 Fordham Blvd and construct new section of path. Planning, design, ROW, and construction by Town of Chapel Hill. Prior Year $2,434,750
EB-5720 R. Kelly Bryant Bridge Trail Construct a multi-use path from NC 55 to Drew-Granby Park, using the R. Kelly Bryant Bridge, in Durham. Planning, design, right of way, and construction managed by the City of Durham. Merged with EB-5833 through FY18-27 Amendment #2. Prior Year $8,190,500
EB-5715 US 501 Bypass (North Duke Street) Sidewalks Construct sidewalk on east side of North Duke Street from Murray Avenue to US 501 Business (North Roxboro Road) to fill in existing gaps. Planning, design, right of way, and construction by the City of Durham. Prior Year $4,774,254
EB-5708 NC 54 Sidewalks Construct sections of sidewalk on south side of NC 54, from NC 55 to Research Triangle Park western limit in Durham. Planning, design, right of way, and construction by the City of Durham. Project is currently in progress for ROW. Prior Year $767,000
EB-5704 Raynor Street Sidewalks Construct sidewalk on one side of street along Raynor Street from North Miami Boulevard to North Hardee Street in Durham. Planning, design, right of way, and construction by the City of Durham. Project is in progress. Prior Year $778,000
EB-5703 LaSalle Street Sidewalks Construct sidewalks on both sides of LaSalle Street from Kangaroo Drive to US 70 Business (Hillsborough Road) and on one-side of LaSalle Street from Hillsborough Road to Sprunt Avenue. Planning, design, right of way, and construction by the City of Durham. 2023 $1,955,000
EB-5542 Statewide Bicycle-Pedestrian Program Prior Year $10,503,000
EB-5514 NC 751 / SR 1183 / SR 2220 Add bicycle lanes and pedestrian improvements along NC 751 from SR 1116 (Garrett Road) to SR 1158 (Cornwallis Road) in Durham. Planning, design, right of way, and construction are in progress by the City of Durham. 2018 $1,930,611
EB-4707B Old Chapel Hill Rd / Old Durham Rd SR 2220 (Old Chapel Hill Rd) and SR 1838 (Old Durham Rd). Full EB-4707 project is from US 15/501 in Orange County to SR 1116 (Garrett Rd) in Durham County. Bicycle, pedestrian, and transit improvements; and construction of a roundabout. Total project length is 2.7 miles. Total project cost for this project is $13,321,000. Break B of the project is from SR 1113 (Pope Rd) to SR 1116 (Garrett Rd) in Durham County. The project schedule and funding for Break B are shown in the table below. 2016 $11,351,788
EB-4707A Old Chapel Hill Rd / Old Durham Rd SR 2220 (Old Chapel Hill Rd) and SR 1838 (Old Durham Rd). Full EB-4707 project is from US 15/501 in Orange County to SR 1116 (Garrett Rd) in Durham County. Bicycle, pedestrian, and transit improvements; and construction of a roundabout. Total project length is 2.7 miles. Total project cost is $11,147,000. Break A of the project is from US 15/501 in Orange County to SR 1113 (Pope Rd) in Durham County. The funding and schedule for Break A are shown in the table below. 2017 $6,666,971
Page 33 of 37