Project List

TIP # Project Name Description Project Expected Start Date Total Cost
C-5605E Durham Bicycle Lane Striping Stripe eight miles of bicycle lanes in the City of Durham. 2018 $829,170
TG-6189 Chatham County Flex to Transit Chatham County STBGDA FY18 funds flexed to transit. Duplicated project in eTIP. Project was authorized 3/28/18. Closed in eTIP as of 5/12/23 due to not being in STIP or on any additional authorization reports. 2018 $43,746
EB-5904 Duke Belt Line Trail Construct multiuse trail on former rail corridor in Durham from Pettigrew Street to Avondale Drive. 2018 $14,459,876
EB-5837 Third Fork Creek Trail Construct a shared use path and sidewalks in Durham from Southern Boundaries Park to the American Tobacco Trail. Install a beacon at SR 1158 (Cornwallis Road). This is an extension of the existing Third Fork Creek Trail. Planning, design, ROW, and construction managed by the City of Durham. 2018 $3,799,092
EB-4707A Old Chapel Hill Rd / Old Durham Rd SR 2220 (Old Chapel Hill Rd) and SR 1838 (Old Durham Rd). Full EB-4707 project is from US 15/501 in Orange County to SR 1116 (Garrett Rd) in Durham County. Bicycle, pedestrian, and transit improvements; and construction of a roundabout. Total project length is 2.7 miles. Total project cost is $11,147,000. Break A of the project is from US 15/501 in Orange County to SR 1113 (Pope Rd) in Durham County. The funding and schedule for Break A are shown in the table below. 2017 $6,666,971
TA-5147 GoDurham Bus Refurbishment Bus refurbishment - 3. 5309 Grant. 2017 $102,000
TA-5146 GoDurham Bus Repower Bus repower - 3. 5309 Grant. 2017 $354,000
TA-4726A CHT Replacement Buses Purchase replacement buses. In progress by Chapel Hill Transit. STP-DA Flex Funds Bus Replacement. 2016 $2,072,331
EB-4707B Old Chapel Hill Rd / Old Durham Rd SR 2220 (Old Chapel Hill Rd) and SR 1838 (Old Durham Rd). Full EB-4707 project is from US 15/501 in Orange County to SR 1116 (Garrett Rd) in Durham County. Bicycle, pedestrian, and transit improvements; and construction of a roundabout. Total project length is 2.7 miles. Total project cost for this project is $13,321,000. Break B of the project is from SR 1113 (Pope Rd) to SR 1116 (Garrett Rd) in Durham County. The project schedule and funding for Break B are shown in the table below. 2016 $11,351,788
U-5543 Variable Message Signs in Chapel Hill Variable message signs for traffic management on major corridors in Chapel Hill. Construction is in progress by the Town of Chapel Hill. 2016 $1,626,250
TG-5255B Durham Neighborhood Transit Center GoTriangle- establish Neighborhood Transit Centers in Durham. Reg B: Neighborhood Transit Center in South Durham in connection with Southpoint Park-and-Ride facility. Total project cost for Breaks B and E is $1,320,000. 2016 $660,000
TG-5255E Durham Neighborhood Transit Center GoTriangle- establish Neighborhood Transit Centers in Durham. Reg E Neighborhood Transit Center in Southwest Durham in connection with Patterson Place Park-and-Ride facility. Total project cost for Breaks B and E is $1,320,000. 2016 $660,000
TN-5102 Operating Assistance -New Freedom Operating Assistance -New Freedom 5317 grant - Urban 2016 $1,764,000
C-5572 West Ellerbe Creek Greenway Trail West Ellerbe Creek Greenway Phase II: Westover Park to Stadium Drive in Durham. Construct multi-use path. Planning, design, right of way, and construction are in progress by the City of Durham. 2016 $2,279,888
U-5119A Phase 2 Alternatives Analysis Chapel Hill Transit Bus Rapid Transit, Phase II Alternatives Analysis, including environmental assessment, design, and engineering. More specific phase-related details: In 2016 – submission of a Small Starts Project Development Application to the FTA at the cost of $20,000. In 2016 – starting and completing an Environmental Assessment under Federal NEPA rules with the outcome of a signed Findings of No Significant Impact (FONSI) by the FTA at the cost of $550,000 to $700,000 depending on the level of transportation analysis and Cultural Resource Analysis. In 2016 and until the project is constructed (assume 2020) – annual required planning and FTA submittals including the update of Small Starts documentation and required documents including (but not limited to) Project Management Plan, Public Involvement Plan, BRT Comprehensive Operations Analysis, BRT Fleet Management Plan, Basis of Design, and Work Breakdown Structure at the cost of $100,000 to $200,000 annually. In 2017 and 2018 – initiation and completion of engineering (preliminary and final) at the cost of $1.5 million to $2.5 million depending on the LPA cross-section. 2016 $4,220,000
Page 34 of 37