© Copyright 2024 - DCHC MPO
4307 Emperor Blvd., Suite 110
Durham, NC 27703
919.560.4366
Site Map
TIP Projects Start new search
Project List
TIP # | Project Name | Description | Project Expected Start Date | Total Cost |
BO-2415 | Morgan Creek Greenway (Chapel Hill) | Bike-Ped project in Chapel Hill. This segment of the Morgan Creek Greenway would connect the existing path at the trailhead to the soon-to-be-constructed Carrboro portion at Smith Level Road. The existing greenway is highly used and extending it to the west to Carrboro and beyond has long been a priority for both Towns. | 2023 | $2,370,000 |
BL-0101 | Cameron Avenue Protected Bike Lanes/Cycle Track | Add bike infrastructure on Cameron Ave from Merritt Mill Road to Pittsboro Street. Project will further consider project areas such as Pittsboro Street to Columbia Street and improvements to the Merritt Mill/Cameron intersection to ultimately connect Libba Cotten bikeway to the UNC Campus, which is one of the highest volume bike corridors in the region. | 2023 | $900,000 |
BL-0070 | Chatham County Pedestrian Safety Improvements | Chatham County is requesting to utilize its STBGDA funds to give to NCDOT for three pedestrian safety projects. We have received HILC funds from Division 8 for $17,500 to partially cover the local match, and the county will providing the rest. Compiled into one total project, we will be giving $139,866 to NCDOT to help carry out 3 bike/ped safety projects around the county. The non-federal match required is $34,966.50. These projects will require no ROW acquisition. | 2023 | $180,133 |
BL-0063 | Horton Road Sidewalk | The Horton Road Pedestrian project seeks to construct a 1.59-mile multi-use path along the south side of Horton Road in Durham from Guess Road to Roxboro Road. Construct a 0.41-mile sidewalk on the north side of Horton Road from Guess Road to connect to an existing sidewalk near Horton Road. This will provide a safe pedestrian option along a busy road in northern Durham and connect residential areas to shopping centers and other destinations. It focuses on connecting lower-income residential areas to shopping areas and reduces the need to access these areas with an automobile. | 2023 | $1,205,667 |
BL-0044 | NC 54 Pedestrian Improvements | NC 54, WESTBROOK DRIVE IN CARRBORO TO WEST OF US 15 / US 501 / NC 86 (SOUTH COLUMBIA STREET) INTERCHANGE IN CHAPEL HILL. CONSTRUCT SIDEWALK AND INSTALL PEDESTRIAN SIGNALS, CROSSWALK | 2022 | $1,486,000 |
BL-0031 | Neighborhood Bike Routes II | ENGLEWOOD AVENUE; GEORGIA AVENUE TO WATTS STREET; KNOX STREET, WATTS STREET TO ACADIA STREET; BIVINS STREET, SR 1127 (CHAPEL HILL ROAD) TO ARNETTE AVENUE; IREDELL STREET, US 70 BUSINESS (MAIN STREET) TO WEST CLUB BOULEVARD; MARYLAND AVENUE, WEST CLUB BOULEVARD TO ELLERBE CREEK TRAIL; CLEVELAND STREET / CORPORATION STREET, US 70 BUSINESS / NC 98 (HOLLOWAY STREET) TO RIGSBEE AVENUE; JUNIPER STREET, SPRUCE STREET TO GUTHRIE AVENUE; LINCOLN STREET / GRANT STREET, LAWSON STREET TO LAKELAND STREET; RIDGEWAY AVENUE / LAKELAND STREET, LAWSON STREET TO MATHISON STREET; LAVENDER AVENUE, ELGIN STREET TO STPEHENSON STREET; STEPHENSON STREET, LAVENDER AVENUE TO SR 1669 (CLUB BOULEVARD); UMSTEAD STREET / LODGE STREET, SR 1118 (FAYETTEVILLE STREET) TO FARGO STREET IN DURHAM. CONSTRUCT BICYCLE ACCOMODATIONS. | 2022 | $400,000 |
BL-0030 | Bike Lane Vertical Protection | Add vertical protection to buffered bicycle lanes in Durham. | 2022 | $197,716 |
BL-0028 | Durham Bike Facilities II | WEST CLUB BOULEVARD, WASHINGTON STREET TO SR 1322 (BROAD STREET); BLACKWELL STREET / CORCORAN STREET / FOSTER STREET, AT TRAILHEAD TO WASHINGTON STREET; SR 1127 (CHAPEL HILL STREET), RAMSEUR STREET TO SWIFT AVENUE IN DURHAM. CONSTRUCT BUFFERED BICYCLE LANES. | 2022 | $1,211,795 |
BK-5101 | Deck Preservation | Deck preservation at 15 selected locations. This project is under construction. | Prior Year | $12,337,000 |
BK-5100 | Establish Bridge Management System | Establish Bridge Management System. This project is in progress. | Prior Year | $2,500,000 |
B-9999SW | Bridge Inspection Program, Statewide | Bridge inspection program. | Prior Year | $189,341,000 |
B-9999REG | Bridge Inspection Program, Regional | Bridge inspection program. | Prior Year | $111,976,200 |
B-9999DIV | Bridge Inspection Program, Division | Bridge inspection program. | Prior Year | $142,006,200 |
B-8888 | Bridge Replacement Holdout | BRIDGE REPLACEMENT PROGRAM - UNPROGRAMMED BALANCE | 2023 | $132,322,000 |
B-6037 | NC 86 Rail Bridge Replacement | REPLACE BRIDGE 670049 OVER NORTH CAROLINA RAILROAD / NORFOLK SOUTHERN RAILROAD. | 2024 | $2,750,000 |
Page 36 of 37