Project List

TIP # Project Name Description Project Expected Start Date Total Cost
M-0360DIV Technical Services, Division Technical services for preliminary engineering for miscellaneous division projects. Prior Year $7,826,000
U-4726IJ Tanyard Branch Greenway Preliminary engineering and design for the future extension of the existing Tanyard Branch greenway trail. The future extension (shown in red in the map below) will be constructed from the existing trail (shown in blue in the map below) to Umstead Park in Chapel Hill. Prior Year $125,000
TO-0004 System Safety Oversight Grant for NCDOT Rail Division 2023 $440,000
TP-4902 SW Support for Local Plans Statewide support to update local community transportation service plans - 5311. Prior Year $3,710,000
R-4701 SW Rural Projects: Traffic System Traffic system operations program (signal maintenance). This project is in progress. Prior Year $278,058,000
R-4049 SW Rural Projects: Traffic Operations Traffic operations (incident management, 511, smartlink, TEC, TMC). This project is in progress. Prior Year $244,131,000
R-4067 SW Rural Projects: Positive Guidance Program Positive guidance program (pavement markings and markers, LED signal head replacement). This project is in progress. Prior Year $91,242,000
M-0391SW Structure Design, Statewide Preliminary engineering for structure design for miscellaneous statewide projects. Prior Year $3,070,000
M-0391REG Structure Design, Regional Preliminary engineering for structure design for miscellaneous regional projects. Prior Year $2,303,000
M-0391DIV Structure Design, Division Preliminary engineering for structure design for miscellaneous division projects. Prior Year $2,303,000
M-0418 Stormwater Runoff Storm water runoff. Research, design, construct, maintain, and monitor storm water drainage from 50 bridges over waterways. (HB 2346, Section 25.18). This project is under construction. Prior Year $6,994,000
HO-0010A Statewide Traffic Operations IMPLEMENT STATEWIDE TRAFFIC OPERATIONS ACTIVITIES SUCH AS TRAFFIC MANAGEMENT CENTERS, TRAVELER INFORMATION, INTELLIGENT TRANSPORTATION SYSTEMS (ITS), AND TRAFFIC INCIDENT AND EVENT MANAGEMENT IN THE TRIANGLE AND METROLINA AREAS 2023 $4,000,000
HO-0010B Statewide Traffic Operations IMPLEMENT STATEWIDE TRAFFIC OPERATIONS ACTIVITIES SUCH AS TRAFFIC MANAGEMENT CENTERS, TRAVELER INFORMATION, INTELLIGENT TRANSPORTATION SYSTEMS (ITS), AND TRAFFIC INCIDENT AND EVENT MANAGEMENT ACROSS THE ENTIRE STATE. 2024 $10,000,000
EB-6033 Statewide Safe Routes to School (SRTS) Education Safe Routes to School Education 2019 $1,875,000
TS-4900Z Statewide RTAP Prior Year $6,807,000
Page 5 of 37