Project List

TIP # Project Name Description Project Expected Start Date Total Cost
U-5937 NC 147 auxiliary lanes from South Duke Street to Briggs Avenue Construct auxiliary lanes and operational improvements on NC 147 from South Duke Street to Briggs Avenue. Amendment #7 to the FY2018-2027 TIP extended the western terminus to Chapel Hill Street. 2027 $58,088,000
U-5934 NC-147 Widening, East End Connector to I-40 Add lanes and rehabilitate pavement on NC-147 from the East End Connector to I-40. 2028 $179,248,000
U-5854 SR 1008 (Mt. Carmel Church Rd) SR 1913 (Bennett Rd) in Chapel Hill. Construct roundabout and related safety improvements. Planning and design for this project are in progress. Prior Year $1,025,000
U-5846 SR 1772 (Greensboro Street) SR 1780 (Estes Drive) in Carrboro, construct a roundabout. Prior Year $3,185,000
U-5845 South Churton Street (SR 1009) Widening SR 1009 (SOUTH CHURTON STREET), I-40 TO ENO RIVER IN HILLSBOROUGH. WIDEN TO MULTILANES. 2026 $59,599,000
U-5823 Woodcroft Parkway Extension SR 1116 (Garrett Rd) to NC 751 (Hope Valley Rd) in Durham. Construct roadway on new alignment. Planning, design, right of way, and construction by the City of Durham. Non-state system facility, local match by City of Durham. 2024 $5,050,000
U-5774F NC 54 Upgrades - Grade Separations at Falconbridge, Farrington, and I-40 The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break F of the project is the I-40/NC 54 interchange improvements, which include grade separations at Falconbridge and Farrington roads. Previous breaks D and E were incorporated into break F in P4.0. 2029 $3,793,000
U-5774C NC 54 Upgrades - Barbee Chapel to I-40 Entire project is to Upgrade NC 54 from Fordham Boulevard in Orange County to NC 55 in Durham County. Break C is to upgrade NC 54 from Barbee Chapel Road in Orange County to I-40 in Durham County. 2029 $28,576,000
U-5774B NC 54 Improvements - Fordham to Barbee Chapel The full project #U-5774 is NC 54 from US 15/501 in Chapel Hill to NC 55 in Durham, upgrade roadway corridor. Total project length for all sections is 9.2 miles. Break B for this project is improvements to NC 54 from US 15/501 (Fordham Boulevard) in Orange County to SR 1110 (Barbee Chapel Rd) in Durham County, upgrade the roadway corridor and convert at-grade intersection with SR 1110 (Barbee Chapel Rd) to interchange. 2027 $59,234,000
U-5774A NC 54,US 15/ US 501 Upgrade Interchange Future Unfunded $19,040,000
U-5745 NC 751 (Hope Valley Road) SR 1183 (University Dr) intersection in Durham. Construct a roundabout. Coordinate with EB-5514. Prior Year $4,385,000
U-5720C US 70 (Miami Boulevard) Upgrades SR 1959 (SOUTH MIAMI BOULEVARD) / SR 1811 (SHERRON ROAD) TO EAST OF SR 2095 (PAGE ROAD EXTENSION). Future Unfunded $68,100,000
U-5720B US 70 (Miami Boulevard) Upgrades - Miami Boulevard Intersection Improvements Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. 2027 $94,800,000
U-5720A US 70 (MIAMI BOULEVARD), LYNN ROAD TO EAST OF SR 2095 (PAGE ROAD EXTENSION). Full U-5720 project information is Lynn Road in Durham to west of Alexander Drive in Raleigh. Upgrade to controlled-access facility and convert at-grade intersection with SR 1811/ SR 1959 to interchange. Total project length is 5.0 miles. 2027 $62,700,000
U-5717 US 15/501 (and Garrett Road) SR 1116 Garrett Road in Durham. Convert the existing at-grade intersection to an interchange. 2026 $32,000,000
Page 5 of 37